General Information
Substation Name
Barrow Substation
Latitude
53.988 °
Longitude
-3.270 °
Comments
Cost of the Substation
EUR(mill) 12
Cost Description
AREVAs Transmission and Distribution division (TD) won a contract in the region of 12 million euros to design, manufacture and install the United Kingdoms first offshore high-voltage substation.
Foundation
Foundation Type
Monopile
Foundation Weight
686 t
Foundation Comments
The weight is broken down as follows: transition piece 208 ton, naked steel top frame 105 ton, monopile 3
您可能关注的文档
最近下载
- 蓄电池远程在线核容系统装置技术要求.pdf VIP
- 焊工工艺与技能训练课件 课题三 气焊、钎焊与气割.pptx VIP
- 新概念英语第一册Lesson-29-30(共50张PPT).ppt VIP
- 车身覆盖件的涂装工艺资料.ppt VIP
- 亚马逊蓝牙音箱产品数据分析报告.pdf VIP
- 小学生四年级上册暑假练字电子字帖生字写字表提前学习练习楷书字帖pdf可打印文件.pdf VIP
- 负压防护隔离器技术要求2022.pdf VIP
- 第二章第三节第2课时化学反应是有历程的的课件高二化学鲁科版选择性必修1.pptx VIP
- 中医内科泄泻PPT.ppt VIP
- 简明新疆地方史读本全册教案 教学设计.pdf
原创力文档

文档评论(0)