- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
老河口灌浆料(Laohekou grouting material)
老河口灌浆料(Laohekou grouting material)
The 158-2718-4950 manager Lu, Laohekou Laohekou high strength grouting material for grouting material manufacturers Laohekou CGM grouting where to buy the material Laohekou CGM grouting material suppliers Laohekou grouting material wholesale Laohekou CGM where the grouting material factory
Laohekou high strength grouting material, model: CGM-1 (Universal) 1 days strength more than 20Mp, the 3 day strength more than 40Mp, 28 days more than 65Mp, with special cement as binder, selected for aggregate high strength material, supplemented by high flow, micro expansion, made from materials such as anti segregation. With good liquidity the micro expansion, early strength, high strength and resistance to oil permeability. Products of superior performance, wide application range, can meet the needs of all kinds of grouting engineering construction, metallurgy, electric power, petrochemical, chemical, machinery, light industry and other comprehensive industry anchor bolts, plant steel structure installation, repair material engineering reinforcement engineering and road and bridge reinforcement in construction has reliable quality, reduce cost, shorten the construction period and convenient use.
Usage method
1. basic processing
Cleaning equipment foundation surface shall not have gravel, slurry, dust, oil pollution and release agent and other debris. 24h before grouting, the equipment foundation surface should be fully moist. 1H should be drained before grouting.
2. determine the grouting method
According to the actual situation of equipment frame, choose corresponding grouting method, because the CGM has good flow property, in general, using gravity grouting method can, will paste the template directly into the mouth, depend entirely on the pulp flow flat on its own weight and filling the perfusion space; if perfusion area is large, complex or special space structure very small and distant, with high funnel method or grouting pressure grout
您可能关注的文档
- 浙江省2010年1月高等教育自学考试(Zhejiang higher education self study examination in January 2010).doc
- 浙江省基础知识(The basic knowledge of Zhejiang Province).doc
- 浙江大学张向荣日语教程第44课课件(Zhejiang University Zhang Xiangrong Japanese tutorial forty-fourth courseware).doc
- 涂料及涂膜常见问题及其解决方法(Common problems of coating and coating and their solutions).doc
- 涉烟刑事案件移送相关法律实务初探(On the relevant legal practice of the transfer of criminal cases involving smoking).doc
- 润滑油词汇(Lubricating oil vocabulary).doc
- 浙江大学2009-2010学年春夏学期乒乓球专项理论课复习题a(Special exercises of table tennis special theory class in spring and summer semester of Zhejiang University 2009-2010 a).doc
- 涨停基因的暗示(Limit gene hint).doc
- 液压专业英语1(Hydraulic professional English 1).doc
- 液力偶合器的工作原理(The working principle of hydraulic coupling).doc
- 2024至2030年中国磷酸愈创木酯行业发展预测及投资策略报告.docx
- 2024至2030年新加坡甲醇行业投资可行性调研专题报告.docx
- 防静电台车项目申请报告.docx
- 聚合物柔性腻子项目申请报告.docx
- 2024至2030年互联网+冰箱压缩机市场前景研究报告.docx
- 2024至2030年中国钨钼冶炼行业市场预测与投资规划分析报告.docx
- 2024至2030年中国化学、电化学(电解)加工机床行业发展预测及投资策略报告.docx
- 2024至2030年中国生物医用材料产业发展前瞻及投资策略咨询报告.docx
- 2024至2030年中国苯乙酸行业深度调研及发展预测报告.docx
- 2024至2030年全球及中国地下设施定位器行业市场分析及投资建议报告.docx
文档评论(0)