施工员职责和权益(Responsibilities and interests of constructors).doc

施工员职责和权益(Responsibilities and interests of constructors).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员职责和权益(Responsibilities and interests of constructors)

施工员职责和权益(Responsibilities and interests of constructors) I. job responsibilities of construction staff 1 、 work under the direct leadership of the project manager, organize the production management of the project construction to ensure the progress, quality and safety of the project. 2, to participate in the preparation of drawings and project schedule, responsible for the preparation of the construction organization design and construction safety, quality, technical scheme, the preparation of the project schedule plan and manpower, equipment, appliances and equipment plan and plan. 3, to assist technical personnel to do a good job in the construction of technical work, to ensure that according to drawings, according to standards, according to the process of organization and construction work, to avoid rework; do a good job matching and limit batching work, put an end to waste of materials. 4, assist the project manager to prepare civilized site implementation plan, according to the construction site reasonable planning layout, site plan, arrange, implement and create civilized construction site. 5. Compile the general schedule of the project and the monthly schedule and the monthly progress plan of each construction team. Assist project manager to organize construction work. Specific include: The construction do Tuiqin, eye ground, mouth, field operations, Valet inspection and guidance, the promotion of new technology and advanced experience, improve production efficiency; During construction, the materials should be finished and civilized construction shall be carried out to ensure the rational use and saving of labor and material; To do a good job in the management and use of mechanical equipment and equipment, and fill in the relevant construction records. 6, improve the sub contracting cost accounting (according to individual and partial) separate timely accounting, and accounting results promptly notify the contractor management personnel, so as to improve th

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档