施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three)).doc

施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three)).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three))

施工现场安全技术操作规程(三)(Safety technical operation rules for construction site (three)) Safety technical operation rules for construction site (three) I. steel worker 1., steel production process using rebar machinery, to strictly abide by the rules of mechanical operation, in order to prevent mechanical wounding and electric shock accident. 2., the straightening of steel: the card should be locked, the anchor to be strong and firm, pull along the tendons along the left and right sides within 2 meters of the forbidden pedestrian, iron cutting machine, bending, bending machine should be handled by skilled workers. 3. installation of steel, according to the location map construction, be firmly connected to the right, protective layer pad to meet the requirements, in the pouring of concrete, steel industry to follow operation, ensure the reinforcement does not shift, ensure the thickness of protection layer. 4., when moving steel bars in place, the vertical transport should be firmly tied to prevent falling wounding, passing steel bars to prevent high voltage lines and other facilities, in case of accidents. 5. when installing side columns, side beams and side wall reinforcement, the operator must operate on a secure platform with railings, and never risk his work. 6., the installation of steel must be based on the bottom, column base, beam bottom and surface cleaning debris. Two carpentry 1. before work check the use of tools is good, storage is appropriate, so as not to fall hurt people, to prevent nails, feet and air slide. 2. installation and removal of more than 5 meters of the template, should be erected scaffolding, and set up protective railings. 3. may not pile up a large number of templates and other materials on the scaffolding. 4. the mould process, such as the way to stop, should be the first support plate, stigma nail. 5. if there are any holes in the template, the template should be covered after installation. 6., support, etc., shall not be built on the doors a

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档