江门市江新联围会城涝区(Jiangmen City, Jiang Wei City Xinlian waterlogging area).docVIP

江门市江新联围会城涝区(Jiangmen City, Jiang Wei City Xinlian waterlogging area).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
江门市江新联围会城涝区(Jiangmen City, Jiang Wei City Xinlian waterlogging area)

江门市江新联围会城涝区(Jiangmen City, Jiang Wei City Xinlian waterlogging area) Jiangmen City, Jiang Wei City Xinlian waterlogging area Comprehensive Drainage Project Environmental impact statement (Abridged Edition) Southern China Institute of environmental science, Ministry of environmental protection Two years, one or two years, February 1 general situation of construction projects 1.1 basic situation of the project Project Name: Jiangmen river city drainage waterlogging area around the new comprehensive renovation project Construction unit: Xinhui District Water Bureau, Guangdong, Jiangmen Project location: Xinhui District, Jiangmen, Guangdong Project introduction: Jiangmen City, Jiang Wei city drainage waterlogging area Xinlian comprehensive renovation project is located in Xinhui District of Jiangmen City, the main task is to solve the problem of city drainage engineering waterlogging area, drainage standards adopted in 10 years the biggest rainstorm in 1 days 24 hours drained, and the highest level within the storage does not exceed the control level. The main measures of drainage include the construction of storage lakes, dredging and dredging of the river and the construction of drainage pumping stations, locks and so on. A total of 3 drainage pumping stations have been built, with a total installed capacity of 5200kW and 3 sluice gates; 13.07 km dredging and dredging channels, and a lake area of 500 thousand m2. The project covers a total area of 280.49 Hm2, of which the main project covers an area of 182.78 Hm2, and covers an area of 97.71 hm2 temporarily. The total duration of the project is 4 years, and it is implemented in two phases for 2 years each. 1.2 engineering tasks and scale 1.2.1 engineering tasks and scales Jiangmen City, Jiang Lian Wai main task of city flood drainage area comprehensive renovation project is drainage, by establishing a perfect drainage system, protecting the area generated in the encounter within 10 years 24 hours rainfall runoff durin

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档