班组工作效率测度与改善 作业自测答案(Measurement of team work efficiency and improvement of self test answer).docVIP
- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
班组工作效率测度与改善 作业自测答案(Measurement of team work efficiency and improvement of self test answer)
班组工作效率测度与改善 作业自测答案(Measurement of team work efficiency and improvement of self test answer)
First, determine the problem
1. Deming is the invention of the statistical quality management Japanese.
Answer: wrong
2. of DELLs supply chain system to achieve zero inventory.
Answer: wrong
3. performance measures more and more attention to financial index system
Answer: wrong
4. focus on efficiency improvement is to reduce the preparation time of production
Answer: right
The 5. constraint theory emphasized the weak chain enhancement
Answer: wrong
6. production capacity is absolutely stable.
Answer: wrong
Make full use of the 7. non bottleneck resources can also increase the rate of production and marketing.
Answer: wrong
8. production capacity is higher than the market demand, but also to enhance the production capacity.
Answer: wrong
9. transport must be equal to batch batch processing.
Answer: wrong
10. the transport volume based on the resource type.
Answer: wrong
11. overall equipment efficiency for system efficiency.
Answer: wrong
12. the efficiency of the system depends on the bottleneck link efficiency.
Answer: right
13. benchmarking belongs to non-financial performance evaluation index system
Answer: right
14. site improvement originated from Toyota Corporation.
Answer: wrong
Statistical quality management based on 15. Sigma six.
Answer: right
The 16. batch should be considered stable production process.
Answer: wrong
Between 17. different processes to the same batch transportation.
Answer: wrong
18. quality does not affect the efficiency.
Answer: wrong
Including the prevention and evaluation of the cost of 19. of the cost of quality cost.
Answer: right
20. traditional performance indicators lack of flexibility.
Answer: right
A single choice
1. time production ideas come from?
A. supermarket
B. anti U production line
C. distribution center
Answer: A
What is the core of the 2. lean production?
A. value chain
B. zero inventory
C. quality consistency
Answer: A
The comm
您可能关注的文档
- 湿式喷射砼施工原理及施工工艺(Wet sprayed concrete construction principle and construction technology).doc
- 溯源引领我走出误区(Origin of lead me out of misunderstanding).doc
- 湖南旅游(Hunan tourism).doc
- 溷凝土搅拌站工作总结(Muddy concrete mixing station work summary).doc
- 湖南省文明标兵单位考评细则(试行)(Hunan provincial civilization unit evaluation rules (Trial)).doc
- 满分作文分析(Out of the composition analysis).doc
- 漫谈进口hifi器材的选购(On the purchase of imported hifi equipment).doc
- 漯河小吃(Luohe snacks).doc
- 潍坊50家特色名吃店(Weifang 50 specialty cuisines shop).doc
- 潍坊led发展现状(The development of LED in Weifang).doc
- 2024-2025学年度广播电视编辑记者自我提分评估及参考答案详解【轻巧夺冠】.docx
- 2024广播电视编辑记者高分题库带答案详解(培优A卷).docx
- 广播电视编辑记者通关题库及参考答案详解【典型题】.docx
- 2024-2025学年度广播电视编辑记者每日一练试卷附参考答案详解(精练).docx
- 2024年广播电视编辑记者题库检测试题打印含答案详解(满分必刷).docx
- 2024-2025学年度广播电视编辑记者能力提升B卷题库及参考答案详解【达标题】.docx
- 2024广播电视编辑记者试卷及参考答案详解【新】.docx
- 2024-2025学年度广播电视编辑记者测试卷带答案详解(综合题).docx
- 2024广播电视编辑记者通关题库(考点精练)附答案详解.docx
- 2024广播电视编辑记者试题预测试卷【精华版】附答案详解.docx
文档评论(0)