- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
erp名称解释(Explain the ERP name)
erp名称解释(Explain the ERP name)
MRP calculation
A finished product, A, consists of a material called B, with a unit dosage of 1,
Now a manual production orders, A number is 100, not picking first in 80 (the remaining 20 are not material),
We now receive a sales order, and the quantity of A is 100,
Now to do the MRP operation, lets talk about the final calculation of the A production plan is how much? What is the B material requirement?
Net demand = gross demand - projected warehousing + assigned quantity - existing quantity + safety stock
Net demand = gross demand - (existing amount + projected warehousing amount already assigned - Safety Inventory)
? gross demand - projected availability of inventories
Projected available inventory = existing amount + projected warehousing - assigned quantity - Safety stock
Then we look at drunk cat problem: for A products, gross demand =100 (sales order quantity), is expected in =20 (manual production orders unfinished, there need to be considered, and the bulk of the time we ignore), allocation =0 (because the 80 inventory in unallocated for any sales orders), the existing =80, =0 safety stock
According to the formula, the net demand of A is =100-20+0-80+0=0,
Of course, here we assume that the A products, in the material under the condition of storage can be.
Similarly, material for B, because the A does not generate new demand, so gross demand =100 (manual production orders 100 A, because A has 80 storage, can not supply, storage (=0) is expected to have the purchase quantity allocation), =0 (zero inventory), the amount of =0. Safety stock =0,
According to the formula, the net demand of B is =100-0+0-0+0=100,
To sum up: net demand for A is 0, and net demand for B is 100,
BOM (bill of materials)
Bill of materials (BOM), also known as product structure table or product structure tree, may be called formula, factor table or other names in some industrial fields. In the ERP liter blue software system, the word material has a wide rang
您可能关注的文档
- 3d术语(3D terminology).doc
- 33建筑构造与详图(33 building construction and detailing).doc
- 3d电影简介(3D movie profiles).doc
- 3d立体影片格式介绍(Introduction of 3D stereoscopic film format).doc
- 3d立体影片格式(3D stereoscopic film format).doc
- 3d计算公式(3D formula).doc
- 3d术语解释(3D terminology explanation).doc
- 3、坡地地貌.ppt.convertor(3, sloping landscape.Ppt.convertor).doc
- 3、坡地地貌pptconvertor(3、坡地地貌pptconvertor).doc
- 3个月,20万赚回800万--法××创造美容院产品招商神话(3 months, 200 thousand earn 8 million - x create beauty salons products investment myth).doc
最近下载
- GB∕T 37903-2019 数控压力机可靠性评定方法.pdf
- SL 274-2020 碾压式土石坝设计规范.docx
- 《植物生产与环境》课程标准.pdf VIP
- 《植物生产与环境》课程标准.pdf
- bosch博世 GBH 5-38 X GBH 5-38 D 使用说明书.pdf
- 最新版入团志愿书模板.pdf
- 职业技术学院园林技术专业《植物生产环境》课程标准 .pdf VIP
- 国内某600MW机组双烟道直流炉省煤器旁路特性研究.pdf VIP
- 《中医基础理论》课件——津液的代谢和生理功能.pptx VIP
- 8 推翻帝制 民族觉醒 第一课时说课稿 -2023-2024学年道德与法治五年级下册统编版.docx
文档评论(0)