- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
世界最高建筑的混凝土施工方案(The concrete construction scheme of the worlds tallest building)
世界最高建筑的混凝土施工方案(The concrete construction scheme of the worlds tallest building)
The concrete construction scheme of the tallest building in the world
Liuhuibin
At the beginning of November 2007, one of the worlds new concrete pump height was born, 601m! The record is composed of ultra high pressure Putzmeister concrete pump in the worlds tallest building - the United Arab Emirates (Burj Dubai Tower) to create the Burj Dubai in construction. The 601m pumping height includes a tubular column and fixed cloth rod, is calculated from the fixed length of the riser in building structure and vertical pipeline length, concrete pouring practice is carried out in 585m height, ideal pumping height has been up to 611m!
The United Arab Emirates Burj Dubai will exceed the height of 800m, the core tube tower construction began in early 2005, the installation of 3 sets of Putzmeister concrete pump, 1 sets of complex pipeline system and 4 fixed cloth rod and the special properties of concrete. Due to the rapid progress of construction, the higher the building, the narrower the structure, the 4 of the 3 fixed distribution rod and 1 pumps were removed. Putzmeister these devices in the engineering construction has withstood the test, and played a great role.
1 prepare the test
Company service providers Unimix concrete suppliers and pump the United Arab Emirates Burj Dubai sent the full trust of Putzmeister companys technical level and reliability on Putzmeister company decided to entrust the supply and installation of pump and cloth rod system. By the early pump test, Putzmeister company has identified pumping height of more than 600m concrete pump and concrete conveying pipe, its export capacity is 30m3/h. For stability, the top of the building will begin with a lightweight steel structure from the 156 floor, and the concrete floor will be poured into the 160th floor of the 611m.
Drag pump transportation simulation of 1.1 super high-rise building
At the beginning of 2005, Putzmeister a
您可能关注的文档
- wifi基础知识(Basic knowledge of WiFi).doc
- windows7搜索功能讲解(The search function on windows7).doc
- windowssystem32configsystem文件丢失或者损坏导致电脑不能启动(The windowssystem32configsystem file is missing or damaged the computer cannot start).doc
- windows操作系统中文件的功能与作用(The function and role of files in the windows operating system.).doc
- windows系统服务官方说明文(三)(Windows system service official Exposition (three)).doc
- wenxue(温雪).doc
- word list 12(词列表 12).doc
- word排版技巧(字排版技巧).doc
- word目录详解(字目录详解).doc
- worldedit 常用指令(Worldedit commonly used commands).doc
- 2025AACR十大热门靶点推荐和解读报告52页.docx
- 财务部管理报表.xlsx
- 高中物理新人教版选修3-1课件第二章恒定电流第7节闭合电路欧姆定律.ppt
- 第三单元知识梳理(课件)-三年级语文下册单元复习(部编版).pptx
- 俄罗斯知识点训练课件-七年级地理下学期人教版(2024).pptx
- 课外古诗词诵读龟虽寿-八年级语文上学期课内课件(统编版).pptx
- 高三语文二轮复习课件第七部分实用类文本阅读7.2.1.ppt
- 高考物理人教版一轮复习课件第4章第3讲圆周运动.ppt
- 高考英语一轮复习课件53Lifeinthefuture.ppt
- 2025-2030衣柜行业风险投资发展分析及投资融资策略研究报告.docx
文档评论(0)