交通部公路工程监理工程师考试《综合考试》题4及答案(Test engineers Ministry of transportation highway engineering supervision questions and answers 4 comprehensive examination).docVIP

交通部公路工程监理工程师考试《综合考试》题4及答案(Test engineers Ministry of transportation highway engineering supervision questions and answers 4 comprehensive examination).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交通部公路工程监理工程师考试《综合考试》题4及答案(Test engineers Ministry of transportation highway engineering supervision questions and answers 4 comprehensive examination)

交通部公路工程监理工程师考试《综合考试》题4及答案(Test engineers Ministry of transportation highway engineering supervision questions and answers 4 comprehensive examination) Comprehensive examination questions 4 I. brief analysis of questions (points) 1, a highway construction project, the project owner will be divided into ten construction contract section, two supervision contract section, and through public bidding to select ten construction units and two supervision units. The supervision units of * * * consulting Supervision Co., Ltd. and * * * consulting company have obtained the supervision task of this project through tender. Ask: (1) how about the order of supervision contract and construction contract? (2) in the process of bidding and selecting construction units, does the supervision unit have the right to decide? Who has the right to decide? (3) is it correct for the contractor to subcontract a part of the works and the subcontractor to choose by the Engineer? Why? (4) if the contractor wants to subcontract some part of the project, who will need approval? (5) during the bid period, the owner or the tender organization only needs to make a written reply to the bidder, is that correct? 2, a highway contract section A, in the construction process without the prior consent of the supervision engineer, the construction unit ordered a batch of prestressed steel strand. After the steel strand has been delivered to the construction site, the quality of the strand has been found following the inspection by the supervisor: (1) the construction unit fails to submit the product qualification certificate, quality guarantee certificate and inspection certificate material; (2) steel strand appearance is bad, without mark. Ask: how should the supervision engineer deal with the above problems? 3, a highway contract section C, the construction unit and the owner signed the construction contract, began to approach construction. The construction unit in accordance with the design provided by th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档