什么叫分层填土(What is the name of layered backfills).docVIP

什么叫分层填土(What is the name of layered backfills).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
什么叫分层填土(What is the name of layered backfills)

什么叫分层填土(What is the name of layered backfills) I. construction preparation 1, materials The backfill: and give priority to the use of high quality soil trench dug. Backfill soil shall not contain organic impurities, particle size should not be greater than 50mm, water content should meet the requirements of compaction. The stone chips: should not contain organic impurities. The materials such as the design requirements of filling, shall comply with the following provisions: 1) (the use of fine gravel, sand, silt should be made with the consent of the design units, and visa formalities) and blasting can be used as ballast; below the surface of the filler. The cohesive soil with water content conforms to the compaction requirement and can be used as filling material for each layer. A cohesive soil of more than 8% of the size of the SOD and used only for filling without compaction. 4) silt and mucky soil are generally not used as fillers, but in soft soil or swampy areas, where the moisture content meets the requirements of compaction, they can be used in secondary parts of the fill. 5) the quality of solid waste soil, flowing peat soil and cohesive soil with organic content greater than 8% shall not be used as filling materials. 2, operating conditions The soil substrate has completed according to design requirements or handle, and handle the visa check slot. Foundation, underground structures and underground waterproof layer and protective layer have been checked and run the covert acceptance procedures, its structure has reached the specified strength. The large before backfilling should be based on the characteristics of the project and the design of fillers, compaction coefficient, construction condition and the compaction process to determine a reasonable water content, the thickness of each layer and compaction construction parameters such as filling. Important fill and subgrade parameters shall be determined by compaction measurements. The indoor platform and t

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档