- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed)
公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed)
Abstract] in recent years, the construction of high grade highway in our province has made great progress in the aspects of design and construction, through the research on the comprehensive stability technology of highway roadbed, developed a large number of new materials for Subgrade Engineering, new technology and new methods have been fully developed and introduced, and all kinds of professional construction company for these new technologies and use of health services, the establishment and development of specialized construction company, which laid the foundation for the construction of special subgrade engineering.
[key] Road, bridge, subgrade construction, construction technology
Subgrade filling and compaction
The strength and stability of highway subgrade depend greatly on the nature of subgrade filling and the degree of compaction. It is the most effective and economical way to improve the quality of subgrade and improve the requirement of filling and compaction.
1. subgrade filling. The specification specifies the proper choice of subgrade filling. On roadbed filler minimum strength and maximum size for a quantitative standard, the CBR values of subgrade strength, introduces the concept of the road bed. The limitation of road bed filling, highway and the highway pavement bottom roadbed filler CBR following 0-30cm value should be greater than 8, filling roadbed and below, also gives the corresponding specified value. When the subgrade is not up to the minimum strength requirements, should adopt mixed coarse aggregate, or replacement, or lime stabilized materials processing, not the provisions of other road paving pavement, also want to use the provisions of highway and the highway value.
2. subgrade compaction. At present, large tonnage roller is widely used in subgrade construction, and the rolling effect has been obviously improved. It plays a very good role in improving the compa
您可能关注的文档
- 人教版五年级数学下册第五单元测试题(Pep in the fifth grade mathematics test for unit volume fifth).doc
- 人教版必修2第一章《物质结构 元素周期律》(The PEP compulsory 2 chapter material structure of the periodic law of elements).doc
- 人教版小学数学六年级期末复习重点难点知识点_百度知道(Know the sixth grade primary school mathematics review of key and difficult knowledge points _ Baidu teach).doc
- 人民币银行结算账户管理办法实施细则(The detailed rules for the implementation of the measures for the administration of RMB bank settlement accounts).doc
- 人民时评中国人如今为何热衷成功学--观点--人民网(People commentary Chinese now why are success - View - people.com.cn).doc
- 人工回填土工艺标准(Artificial backfill technology standards).doc
- 人生三级跳从打工仔到烤鸭大王(Life three jump from wage earners to Roasted Duck King).doc
- 人生名言(Life quotes).doc
- 人生格言2(Life motto 2).doc
- 人工智能(第八章)(Artificial intelligence (the eighth chapter)).doc
- 抢分秘籍10 带电粒子电场中的直线运动、偏转和交变电电场中的应用(三大题型)(原卷版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍11 带电粒子在组合场、叠加场中的运动(五大题型)(解析版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍11 带电粒子在组合场、叠加场中的运动(五大题型)(原卷版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍12 电磁感应中的电路与图像问题(二大题型)(解析版) -2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍12 电磁感应中的电路与图像问题(二大题型)(原卷版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍14 热力学定律与气体实验定律综合应用(五大题型)(解析版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍13 电磁感应中的动力学、能量和动量问题(三大题型)(原卷版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍14 热力学定律与气体实验定律综合应用(五大题型)(原卷版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍16 振动图像与波动图像的综合应用(三大题型)(解析版)-2025年高考物理冲刺抢押秘籍.pdf
- 抢分秘籍15 光的折射、全反射的综合应用(二大题型)(解析版)-2025年高考物理冲刺抢押秘籍.pdf
文档评论(0)