网站大量收购独家精品文档,联系QQ:2885784924

公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed).doc

公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed)

公路路基施工技术的浅议(Discussion on the construction technology of highway roadbed) Abstract] in recent years, the construction of high grade highway in our province has made great progress in the aspects of design and construction, through the research on the comprehensive stability technology of highway roadbed, developed a large number of new materials for Subgrade Engineering, new technology and new methods have been fully developed and introduced, and all kinds of professional construction company for these new technologies and use of health services, the establishment and development of specialized construction company, which laid the foundation for the construction of special subgrade engineering. [key] Road, bridge, subgrade construction, construction technology Subgrade filling and compaction The strength and stability of highway subgrade depend greatly on the nature of subgrade filling and the degree of compaction. It is the most effective and economical way to improve the quality of subgrade and improve the requirement of filling and compaction. 1. subgrade filling. The specification specifies the proper choice of subgrade filling. On roadbed filler minimum strength and maximum size for a quantitative standard, the CBR values of subgrade strength, introduces the concept of the road bed. The limitation of road bed filling, highway and the highway pavement bottom roadbed filler CBR following 0-30cm value should be greater than 8, filling roadbed and below, also gives the corresponding specified value. When the subgrade is not up to the minimum strength requirements, should adopt mixed coarse aggregate, or replacement, or lime stabilized materials processing, not the provisions of other road paving pavement, also want to use the provisions of highway and the highway value. 2. subgrade compaction. At present, large tonnage roller is widely used in subgrade construction, and the rolling effect has been obviously improved. It plays a very good role in improving the compa

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档