网站大量收购独家精品文档,联系QQ:2885784924

公路路基的施工及质量控制(The construction and quality control of Highway Subgrade).doc

公路路基的施工及质量控制(The construction and quality control of Highway Subgrade).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路路基的施工及质量控制(The construction and quality control of Highway Subgrade)

公路路基的施工及质量控制(The construction and quality control of Highway Subgrade) Construction and quality control of Highway Subgrade [Abstract] the subgrade strength is the fundamental way, only in accordance with the construction process of some elaborate construction and take reasonable means of detection and control, to ensure the quality of construction, only the roadbed construction quality control, to give the structure layer, surface layer and lay a good foundation. [key] subgrade construction quality control 1 Principle Analysis of subgrade stability There are three requirements for the inherent quality of the subgrade: sufficient overall stability, sufficient strength, and adequate water stability. In short, the roadbed is to achieve dense, uniform and stability of the use requirements. The densification process of subgrade is actually a process of particle recombination, but for rock fill subgrade, it is the process of rock displacement recombination. Subgrade stability is relative, that is to say, when the subgrade under external stress, no displacement or displacement between rock can be controlled in a certain standard, we can think that the subgrade is stable at first. In the design period, under the influence of design load, the displacement can be controlled in a certain standard, then we can think that the subgrade has been qualified in the process of using. The subgrade stability is determined by the overall stability of the roadbed, roadbed, depends on two aspects: one is the formation of rock mass rock filling the void ratio, the void ratio itself rather than a rock. Two is the strength of the rock. I hope the filler has good gradation, and easily compacted, and as far as possible so that the broken rock is the most direct way, and the degree of fragmentation depends on the strength of the rock types and compaction equipment; compacting process of subgrade filler is actually broken edges, filling compaction process, so the forming, the subgrade stability

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档