网站大量收购独家精品文档,联系QQ:2885784924

公路gps勘测测量(Highway GPS Survey).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路gps勘测测量(Highway GPS Survey)

公路gps勘测测量(Highway GPS Survey) Internship location: Ankang area This internship is an integral part of the graduation project. It will be able to exercise its actual work ability in the specific project of the production unit. This time, with the Shaanxi Highway Survey and design institute together, to the North (Arong Qi to Beihai) highway Ankang to Shaanxi, Sichuan sector, into the GPS highway surveying and surveying. In April, the well-being of the regions picturesque scenery, lush. A scene of spring follows. Along the river Jasper, pleasant scenery, in the survey and also a glimpse of the motherland beautiful rivers and mountains of a country. For me, it was a windfall. Introduction to l Engineering Ankang to Shaanxi Sichuan is the western development highway Arong Qi to Beihai line in the territory of Shaanxi for a period of time, our province is an important part of the m type highway framework, its construction to promote the implementation of the western development strategy, improve the national and provincial highway backbone network, strengthen economic ties between the northwest and southwest area the promotion along the rich resources of natural resources and tourism development, accelerate the pace of poverty along the masses, has important significance in promoting the development of local economy. The highway starts from Yin Jia camp five town Hanbin District village, the river to the well-being of the expressway by the end point, water town, Ziyang County, Gaotan Town, Maoba township to Shaanxi Sichuan at the junction of the white Yangxi, the route length of 105.364 km, 7 billion 443 million yuan investment project, intends to use the world bank loan of $350 million, has been included in the state by World Bank 2004 ~ 2006 year loan plan, and carry out the preparatory work for the project according to the simplified project evaluation period is 12 months, to ensure that the first half of 2006 started construction. L internship time: 2005-4-9-------

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档