建筑师命题(The architect proposition).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑师命题(The architect proposition)

建筑师命题(The architect proposition) A single choice (a total of 20 questions, 1 points for each question, options for each question, only 1 of the most to do) 1, choose the general idea of hammer piling equipment (for) A heavy hammer hammer type, select select pile frame B selection of hammer type to choose to choose the heavy hammer pile frame C pile frame select the heavy hammer, hammer type selection D pile frame select type, choose the heavy hammer hammer 2, reinforcement of foundation soil improvement method belongs to the () A replacement B net??? C D dynamic pile? 3, the road with lime dosage of lime stabilized soil refers to the lime dry weight accounted for the percentage of (). A dry weight B lime soil lime soil??? C dry weight of soil D soil heavy 4, at present, the more surface layer of cement concrete pavement in China (concrete board). A B (Su) rolling?? C continuous reinforced D reinforced? 5, cement concrete pavement construction, the pavement concrete (strength mix design). The A compressive bending? B?? C? D tensile shear?? 6, the bearing layer in the pavement structure is () A layer B C layer?? base?? D Subgrade 7, take the demolition of steel tubular scaffold, should be put in the first place (). A schedule? B C safety D the cost of quality?? 8, cut the tendons shall not be used (cutting). A cutting machine? B wheel saw C arc D acetylene oxygen? 9, the cast-in-place prestressed concrete girder construction, the deformation value of the camber is arranged to consider the following, do not meet specifications (is) Vertical deflection of A unloading after the superstructure itself and all the live load Compression of B stent in loads of elastic and inelastic C support foundation under load of non elastic settlement leaching D by concrete shrinkage and temperature changes caused by the deflection 10, the soft soil area of underground continuous wall slot, will not cause the collapse of slot wall is () A groove wall mud viscosity is too low?? B guide wal

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档