- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
彩钢房安装工序(Caigang room installation process)
彩钢房安装工序(Caigang room installation process)
How do the room
The first step: the foundation survey
1, with the tools of measuring length and width of foundation, verify that it is in our business this coincides with the size of;
2, observe the other requirements according to our foundation is the business staff;
3, if the customer does not provide the foundation according to the requirements, the team can be put forward to the project manager, the project manager in a timely manner to the relevant departments and personnel to negotiate.
The second step: put the line.
1, on the ground mark according to the requirements of installation position of ink to provide location pop-up geosyncline, the basis for the next installation of geosyncline;
2, put the line only need to put the front and rear wall line geosyncline;
3, if it is a standard type of housing, between the front and rear wall geosyncline line distance is 6.26 meters, such as standard type of housing to special instructions;
4, front and rear wall line respectively from the standard before and after the foundation of geosyncline along 10 cm.
Third step: put iron geosyncline.
1, along the second steps of the ink on the iron trough;
2, the outer edge of the ink with iron geosyncline;
3, standard type expansion pipe, each with eight iron geosyncline expansion pipe, to play.
The fourth step: Anping bridge.
1, a flat beam and two columns before and after moving to the appropriate location in the foundation;
2, the flat beam on both sides of the screw holes are respectively aligned before and after column screw holes on the middle Han iron tablets;
3, fixed by screws and flat beam column.
Note: screw not less, not.
The fifth step: help, and even the two beams.
1, the flat beam and column supporting the fourth step up;
2, the column foot sheet is clamped and geosyncline iron column foot screw hole alignment iron screw holes on both sides of the geosyncline;
3, find the site on a steel pipe or other alternatives to the
您可能关注的文档
- 北京城门(The gates of Beijing).doc
- 北京殡葬调查(Beijing funeral survey).doc
- 北京甲级设计院(Beijing grade A Design Institute).doc
- 北京试验员考试大纲(Beijing test examination syllabus).doc
- 北岭地震和贩神地震后美日钢框架节点设计的改进(To improve the Northridge earthquake and after the earthquake in Japan. The God of steel frame joint design).doc
- 北川羌族非物质文化遗产的保护现状调查分析(Analysis of the survey of the protection status of Beichuan Qiang intangible cultural heritage).doc
- 北师大版高中数学必修1——5目录(Beijing Normal University high school mathematics compulsory 1 - 5 directory).doc
- 北戴河游记(Travels in Beidaihe).doc
- 北方地区常用绿化树种简介(Brief introduction of species common greening in northern area).doc
- 北斗简述(The Big Dipper).doc
文档评论(0)