- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
镀覆孔的质量控制和检测方法(Quality control and inspection method of plated hole)
镀覆孔的质量控制和检测方法(Quality control and inspection method of plated hole)
When the solution work for a period of time (the length of time is determined by the load, the amount of solution) with a test board (with holes) with the product through the copper production line, in order to test the deposition rate meets the technology requirements. In accordance with the requirements of the process, the product board must also use the hole inspection mirror to check the product board, and then transfer to the next process. If the technical requirements are not met, the backlight test must be carried out for further testing and judgment. The specific methods for testing the deposition rate of copper and the backlight test are as follows:
1. determination of deposition rate:
First off the copper substrate, cut to size is 100 * 100mm (1dm2) in the test board a row of holes, keep the backlight test. The deposition rate was measured by drying 1 hours before and after copper precipitation at 120, and weighing again. The rate of copper deposition can be calculated by the lower model:
S = /t * 5.580 (W2W1)
Formula: S copper deposition rate (m/min)
W1 weight of pre test plate (g)
W2 weight of test plate after copper precipitation (g)
T copper precipitation time (min)
5.580 - 1 Cu per deposit, new copper layer thickness is increased (m)
Detection of 2. backlight experiment:
The density of copper deposits is mainly detected. The criteria for evaluation shall be based on the standards provided by the supplier. The German Shering company will sink copper layer density is divided into 12 grades back up to 5, and the lowest is 0.5 level; the other companys grading standards are different, there are assessment of eligibility criteria, such as the backlight level is below standard, the density copper layer, the electroplating it can not guarantee the quality of the final. The concrete method is to cut a piece of substrate material with holes into the sample, and then cut or grind it to the cent
您可能关注的文档
最近下载
- 国标阀门型号编制方法JBT308-2004.PDF
- 2024年福建省能源石化集团有限责任公司春季校园招聘455人笔试参考题库附带答案详解.pdf
- 76G-3预应力长向圆孔板.pdf
- 数字媒体艺术_梦境主题“梦幻之旅”插画绘本设计.docx VIP
- 演示文稿国际结算的几种方式.ppt VIP
- C被遗弃的少女 das verlassene magdlein声乐正谱五线谱钢琴伴奏.pdf
- 七年级下数学数形结合附答案解析.pdf
- 教科版科学四年级下册 第三单元 岩石与土壤 5 岩石、沙和黏土.ppt VIP
- 软件系统试运行报告.doc VIP
- DLT 284_输电线路杆塔及电力金具用热浸镀锌螺栓与螺母.pdf
文档评论(0)