建设程序和招投标(The construction procedures and bidding).docVIP

  • 5
  • 0
  • 约1.12万字
  • 约 10页
  • 2017-08-17 发布于河南
  • 举报

建设程序和招投标(The construction procedures and bidding).doc

建设程序和招投标(The construction procedures and bidding)

建设程序和招投标(The construction procedures and bidding) Understanding a week of practice, let us benefit. However, for the construction of the bidding procedures and the basic procedures for us is not very clear. Through self check, with so many days to experience, write a little experience under their own self, to share with you. A general program of building engineering. 1. design Design generally refers to a construction project put forward the idea of development, namely before investment stage. This stage includes the proposed project proposals; approved the feasibility study report; project evaluation report form three items, to reach the final goal of the project. The project proposal. The project proposal is the initial stage of construction project development cycle, put forward a profiledesign, observe the necessity of project construction from the macro. Its main role is as the basis for the project construction. The main contents of the project proposal: 1). The construction project of the basis and the reason, background materials, the location of the long-term planning, industry and regional planning. 2). The scale and construction site tentative argument. 3). The feasibility and reliability of cooperation resources, construction conditions. 4). Investment estimation and fund raising plan. 5). The design and construction of the project schedule. 6). Analysis of economic effect and social benefit and chugu. The feasibility study report. The feasibility study report of the project is in the project investment decision, based on project related engineering, technical and economic aspects of conditions and circumstances to research, analysis, comparison, demonstration and forecast after the completion of the construction of the benefits of possible solutions and technology solutions. Advanced technology on the basis of the comprehensive study of the construction project and applicability, the comprehensive benefit of rationality, and the construction of the poss

文档评论(0)

1亿VIP精品文档

相关文档