- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桩承台施工工艺标准 (207-1996)(Construction standard of pile cap (207-1996))
桩承台施工工艺标准 (207-1996)(Construction standard of pile cap (207-1996))
Construction standard of pile cap (207-1996)
Range
This technology is applicable to industrial and civil building pile foundation beam.
Construction preparation
2.1 materials and main equipment:
2.1.1 cement: use No. 325 to No. 425 slag Portland cement or ordinary Portland cement.
2.1.2 sand: medium sand or coarse sand, containing less than 5% of the mud. Water: use tap water or clean water without harmful substances.
2.1.3 stone: gravel or gravel, the size of 5 ~ 32mm, containing mud is not greater than 2%.
2.1.4 reinforcement: the grade and diameter of the reinforcement must comply with the design requirements. There is a factory certificate and a re examination report, with no rust or oil on the surface.
2.1.5 cushion block: use 1: 3 cement mortar, bury 22 big burning silk, advance prefabricated or use plastic card pad.
2.1.6 fire wire: specifications No. 18~20 wire burn.
2.1.7 admixture and admixture shall be determined by test according to construction requirements.
2.1.8 main tools
2.1.8.1 concrete: should have a scale, concrete mixer, insert type vibrator, flat tip shovel, rubber tube, trolley, wooden trowel and iron plate etc..
2.1.8.2: steel banding should have steel hook, wrench, small crowbar, guillotine (off fire wire), hook machine, wooden folding ruler and composite steel formwork etc..
2.2 operating conditions:
2.2.1 pile foundation construction has been completed, and according to the design requirements of digging the soil, and completed the pile foundation construction acceptance records.
2.2.2 pile of concrete pile top dressing: loose concrete all tick end, such as the pile top is lower than the design elevation, the concrete should be used with high above the pile strength reached 50%, and then buried in the pile top beam part cutting, punching net. If the pile top is higher than the design elevation, should be pre chisel, the top of the pile into the beam depth meets the design r
您可能关注的文档
- 接触网工技师练习题论述题(Contact network technician exercises on the title).doc
- 接地网的建设(Grounding construction).doc
- 接地安装标准(Earthing installation standard).doc
- 接触网工技能鉴定复习题---中级工部分(Contact net work skill appraisal review questions - the intermediate part).doc
- 接触网故障(Catenary fault).doc
- 接地概念及安防监控中常遇到的问题(The concept of security monitoring and frequently encountered problems in the).doc
- 接触网答辩题(Contact net topic).doc
- 推土机故障排除六实例(Bulldozer troubleshooting six examples).doc
- 控制性详细规划cad制图要求规定(Detailed planning control CAD drawing requirements).doc
- 推木头bloxorz游戏密码和攻略(立体推木头)(Push wood Bloxorz game password and Raiders (stereo push wood)).doc
- 桩承台梁工艺标准(The pile capping process standards).doc
- 梁桥悬浇法施工(Cantilever casting method for beam bridge construction).doc
- 梁的种类及其区别(Types and differences of beams).doc
- 梁材料的 选择(Selection of beam material).doc
- 梦幻西游挖宝秘籍(Dream swims on the west part.).doc
- 梨木台导游词(Lei Taiwan tour guide word).doc
- 梦想参考资料(Dream reference material).doc
- 梦想因行动成真dream come true for action(梦想因行动成真梦想成真的行动).doc
- 检查技术的某些知识(Check certain knowledge of Technology).doc
- 检测员考试1(Examiner exam 1).doc
文档评论(0)