- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水利3(Water conservancy 3)
水利3(Water conservancy 3)
Water conservancy, hydropower and water conservancy: case one, procedure error. Without the intermediate handover, it is wrong to do the linkage test directly. Intermediate handover is a necessary procedure for the construction unit to transfer the project to the construction unit, which marks the end of the construction and installation of the project. After the intermediate handover, the project is shifted from single trial operation to linkage test operation. Export pipeline system after water pressure test of centrifugal pump test run 2. pump installation is connected with the pipeline should be rechecked after, the pump alignment accuracy of 3. test run within the scope of the project according to the quality standard of design documents and relevant specification complete definition of quality problems in regulation: to direct economic losses in the amount of the following provisions no, do not affect the cause permanent quality defects and engineering structure safety and using function, as a quality problem. The cause of the quality problems in the event 1 is: (1) breach of the construction procedures: not in accordance with the construction procedures, without acceptance of the delivery. (2) management and construction are not in place. (3) the use of substandard materials and equipment. (4) the natural environment is not ideal. The basic conditions for the operators to operate are to be familiar with the construction, performance and technical documents of the equipment; to be familiar with the commissioning plan; to master the operating procedures and the specific steps and methods of operation. Case three. A large (2) type 1. Figure 1 dam dam Zoning: (1): the concrete panel (2): heavy pressure zone (3): transition zone (4): the main contents are: 2. stone mound District review (1) to ensure the rockfill body strong, stable, compressive strength the main parts of the stone should be not less than 78Mpa, while the compressive stren
您可能关注的文档
- 数控机床论文摘要数控论文(Abstract the NC NC machine tool).doc
- 数控火焰切割机(NC flame cutting machine).doc
- 数控加工工艺设计的主要内容(The main content of NC machining process design).doc
- 数控课程设计总结(Summary of numerical control course design).doc
- 数控答辩(NC reply).doc
- 数控论文(The NC).doc
- 数控车刀(CNC lathe tool).doc
- 数控车削编程特点(The characteristics of CNC lathe programming).doc
- 数控车工考证(Research of CNC lathe).doc
- 数控车床gm指令(CNC lathe GM instruction).doc
- 《新能源汽车电机碳纤维转子技术要求》征求意见稿.docx
- 《电缆线生产用牵引设备》征求意见稿.docx
- 《电缆线生产用牵引设备》征求意见稿.pdf
- 电解锰产业废物综合利用标准——利用电解锰渣制备水处理填料技术指南-编制说明-(征求意见稿).docx
- 《土家医特色门诊建设指南》征求意见稿.docx
- 《水产类净菜》编制说明(征求意见稿).docx
- 《电化学储能系统安全设计与防火技术规范》(征求意见稿)编制说明.docx
- 《菌菇类净菜》(征求意见稿).docx
- 《升压站无功补偿装置(SVG)运行维护规程》(征求意见稿).docx
- 《基于印刷 OLED 薄膜封装材料的压电式喷头模组》征求意见稿.docx
文档评论(0)