水泥粉喷桩施工方案(Construction scheme of cement powder spraying pile).docVIP

水泥粉喷桩施工方案(Construction scheme of cement powder spraying pile).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水泥粉喷桩施工方案(Construction scheme of cement powder spraying pile)

水泥粉喷桩施工方案(Construction scheme of cement powder spraying pile) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. I. The general situation of the project, the treatment of soft soil foundation with the powder sprayed pile in this section is located in the engineering geological area of the Yangtze River valley plain. The major unfavorable geological conditions are soft soil and sandy soil liquefaction. In order to reduce the settlement after construction, to ensure the stability of solution structures such as the jump disease, designed by spray powder pile on soft soil foundation treatment. The treatment section is K73+643-K76+815, with 14498 piles, and the total length is 93512 meters. Two, according to the construction site, we have sent Runyang north line A2 standard construction 490 thousand construction personnel Rice noodles pile extension experienced and sophisticated construction equipment ready to enter, and formed a working group pile, headed by road engineer, quality inspection engineer, test engineer, material, safety supervisor responsible for the crew, to implement all-weather quality management of the project, fully responsible for the management by the project manager, unified management and deployment of command personnel, machinery, equipment etc.. Plan 15 January before the management of all construction personnel in place, are all in place. The staff are as follows: 1, personnel organization (1), project management network department organization chart (2), the construction organization arrangement of labor a pile machine arrangement 3, Captain General of about 4. Construction may be based on the actual progress of the project, considering the number of auxiliary power workers. 2 、 construction equipment and mechanical equipment Organization (1) instrument and equipment Name of instrument level Aluminum Alloy tower ruler ruler model DS3 5 meters 50

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档