- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
泥浆护壁(Mud protection wall)
泥浆护壁(Mud protection wall)
The 1. construction methods of bored piles of the
1.1 technological process: drilling location, burying the retaining tube, drilling rig location, correction, horizontal and vertical hole, hole cleaning, placing steel cage pipe, two times cleaning hole, pouring concrete, retaining test block. The
1.2: the main construction equipment
1.2.1 special hole forming machine: drilling machine, suction pump, slurry pump, air suction mud machine, slag extraction cylinder, etc.. The
1.2.2 concrete mixing machine tools: metal conduit, concrete bucket, storage hopper, lifting device, water frame, concrete mixer and metering and transport equipment. The
1.2.3 pulping machines: mud mixers, mud pumps, air compressors, water pumps, cyclones, inertial vibrating screens, sludge cleaning equipment, slurry density profiles, funnel viscometer, and sand content measuring apparatus. The
1.2.4 other equipment: welding machine, welding machine, pneumatic steel hook machine, cutting machine, welding machine, wrench, crane rope measuring and measuring hammer. The
1.3 pile hole positioning: before construction, according to the pile axis, each pile leads to the center of the cross line, small nails fastened in the pile hole near the stake with the center line, the pile position deviation within 10mm, and has laid a solid mark stake. The
1.4: shield tube burying tube commonly used tool type steel tube, using a rotary drill, drill diameter than the diameter of 100mm, on the upper part of high 1 ~ 2 overflow hole, the position of the buried steel tube accurately and stably, between tube and wall filled with clay, casing and pulp discharge port mud ditch, casing center line and the pile line deviation of not more than 50mm, casing in cohesive soil depth of 1 meters, casing is higher than the ground 100 ~ 200mm, for free floating wall mud surface, scour hole wall collapse caused by lead, maintain higher level of underground water hole plasma surface more than 1.0m. The
1.5
您可能关注的文档
- 最新幼儿园设计规范(New kindergarten design specifications).doc
- 最新更新男女四开身基本结构图之整体制图袖子制图(Update the overall drawing of men's and women's four basic structure drawings, sleeve drawings).doc
- 最新的新闻评论422(The latest news review 422).doc
- 曲轴(crankshaft).doc
- 最新结构设计satwe总信息参数规范链接(Latest structural design SATWE total information parameter specification link).doc
- 最有诗意的网名(The most poetic screen name).doc
- 最的成语(Most of the idioms)(最的成语 (now of the idioms)).doc
- 月球--不是自然天体(The moon is not a natural object).doc
- 最终说明(Final description).doc
- 月季(Chinese rose).doc
- 泥塑课程教学大纲_课程标准_课程教学_精品课程(Clay _ curriculum standard curriculum syllabus _ course teaching _ courses).doc
- 泥鳅专养池技术(二)(Loach pond technology (two)).doc
- 泥浆添加剂(Mud additive).doc
- 注册会计师税法练习题0901(CPA tax law exercises 0901).doc
- 注册公共设备师考试概括(Registered public service division exam summary).doc
- 注册地质师(试行)(Registered geologist (for Trial Implementation)).doc
- 注册岩土工程师考试用书(Registered geotechnical engineer examination book).doc
- 注册工程师参考用书(Reference book for registered engineers).doc
- 注册岩土模拟试卷(Registered geotechnical simulation paper).doc
- 法拉第k4(Faraday K4).doc
文档评论(0)