- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
测量总结(Measurement summary)
测量总结(Measurement summary)
To ensure that each part of the route and structure can accurate positioning and construction process of individual pile loss can also have enough accuracy for recovery of pile position. The measuring staff formally accepted the traverse points and leveling points of pile position, should be based on the specification and technical requirements of construction site, immediately carry out encryption work measurement and control network construction. Encryption, measurement, networking and embedded pile control network calculation completed by independent measurement. Complete the work of the staff should have qualified qualifications and work experience, the use of the instrument must be tested for calibration, the accuracy meets the requirement. To control network surveying party encryption safety case. Complete the measurement control network encryption work, the book should be oriented to supervision engineer submit reports and information data calculation. Review supervision engineer test results for review, that is accurate, precision to meet the requirements, can be used as control points.
Review of construction lofting
The measurement personnel should according to the design requirements the location and elevation of road structures, correctly fixed to the ground. In order to prevent the error construction lofting survey, bringing losses to the project, has been perfected and approved by the engineer measurement and control network construction, start construction lofting work concrete project. In the survey and setting out before the start of measurement should submit a survey layout plan, supervision personnel measurement lofting process should be next to the station, to ensure the construction lofting method and correct reading. The inspection and surveying table records should be audited prior to commencement of construction supervision engineer sign. First of all, preparation of measurement scheme, in the construction process of
您可能关注的文档
- 机动车辆保险附加新赔偿标准保险条款(Motor vehicle insurance additional new indemnity standard insurance clause).doc
- 机动车买受人与无偿帮工肇事司机的连带赔偿责任(Motor vehicle buyer joint liability and unpaid helper driver).doc
- 机子老掉线的问题解决(The problem of dropping the old computer).doc
- 木星圈的凶星—pmx-000梅萨拉高达机体简介(Jupiter ring - pmx-000 malefic mesala up to the body.).doc
- 机床问答题(Machine tool questions and answers).doc
- 机床夹具设计毕业论文(Design of machine tool jig).doc
- 机械制图标准(Mechanical drawing standard).doc
- 机械专业毕业设计题目大全(Mechanical engineering graduate design topics Daquan).doc
- 机械制造课程设计杠杆(一)工序卡零件图(Mechanical manufacturing, curriculum design, lever (part), process card, part drawing).doc
- 机械制造技术(Mechanical manufacturing technology).doc
- 浅谈后张法预应力空心板梁预制施工工艺(Preliminary discussion on precast construction technology of post tensioned prestressed hollow slab beam).doc
- 测井曲线符号(Logging symbols).doc
- 浙江游艇企业我们是应该顶住压力前进,还是继续在原地徘徊_百度...(Zhejiang yacht enterprise should we resist the pressure, or continue to linger in situ Baidu _...).doc
- 浙江经济考察的见闻与启示(The knowledge and Enlightenment of Zhejiang economic investigation).doc
- 浦发银行轻松理财卡功能介绍(Shanghai Pudong Development Bank relaxed financial card function introduced).doc
- 浮选(flotation).doc
- 浮力测试题3(Buoyancy test 3).doc
- 海底两万里简介(Brief introduction to the twenty thousand mile submarine).doc
- 海上交通安全与管理[毕业论文】(Maritime traffic safety and management [Thesis]).doc
- 海底两万里(Twenty thousand miles below the sea floor).doc
文档评论(0)