清淤换填处理(Dredging and filling treatment).docVIP

清淤换填处理(Dredging and filling treatment).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
清淤换填处理(Dredging and filling treatment)

清淤换填处理(Dredging and filling treatment) Special fish A special period of special fish ponds Fishpond special subgrade construction The subgrade construction of subgrade filling construction The construction scheme of Subgrade Plan programme A project overview: This section K85+870.164 ~ K86+210.813 section of Subgrade after all or part Large fish ponds, the total drainage area of 17147m2, the average depth of 1.5m, the number of drainage The amount of 25720.5m3, the dredging area 12905m2, silt thickness 0.8m, digging silt backfill 10324m3, slag thickness 0.8m, backfilling slag quantity 10324m3, geogrid 12905 m2. Two, construction preparation 1 preparations and construction: the construction survey lofting work, on-site release line subgrade, To determine the height and the fixed peg construction in the protection of all. The construction of a temporary detour, The lateral ramp and subgrade drainage facilities, and to the original ditch and bridge. 2, pond water drainage, drainage pond water table with high power mud pump, when the water level dropped to the bottom of the pond Or when a large amount of water, the use of dewatering and timely pumping well water. Cooperate with excavator Dump truck to completely remove silt. Three, the main construction personnel and mechanical equipment 1, personnel Name and job title note Xu Xuhua, the person in charge of the construction site manager engineer The Zhang Yong project chief engineer senior engineer technical director Wang Changsen, chief technical engineer Tang Zhaozhong, chief engineer Li Huixin is responsible for the safety and quality test engineer The person in charge of Measurement Engineer Wu Zhenguo The captain Wu Shixing 2, mechanical equipment The number of mechanical type unit Table 1 CAT320 excavator Table 1 T140 bulldozer Table 1 Zl50 loader The dump truck 18T 5 Sludge pump / 2 Roller YZ18 Taiwan 1, four construction schedule The program start date: January 20, 2006 start. Planned completion date: March 5, 2

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档