珠海某厂区内泵房基坑失稳事故的分析及处理(Analysis and treatment of unstable accident of foundation pit of pump house in a factory in Zhuhai).docVIP

珠海某厂区内泵房基坑失稳事故的分析及处理(Analysis and treatment of unstable accident of foundation pit of pump house in a factory in Zhuhai).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
珠海某厂区内泵房基坑失稳事故的分析及处理(Analysis and treatment of unstable accident of foundation pit of pump house in a factory in Zhuhai)

珠海某厂区内泵房基坑失稳事故的分析及处理(Analysis and treatment of unstable accident of foundation pit of pump house in a factory in Zhuhai) Analysis and treatment of a plant in Zhuhai pumping station foundation pit accident Yu Ming Zhang (Guangdong province Zhuhai Engineering Investigation Institute 519002) Abstract: in this paper, a Zhuhai area pump foundation pit as an example, based on the foundation pit engineering is introduced, analyzed the causes of instability accident, and make a treatment plan according to the actual situation; in the foundation pit supporting foundation pit, regardless of size, if not caused enough attention, small pit instability may be the occurrence of major accidents. Keywords: foundation pit; stability analysis; 1 project overview The 1.1 excavation situation, the surrounding environment and geological conditions of the site (1) of foundation pit A plant in Zhuhai pump foundations pit excavation area is 420m, length of 85m from the ground pit excavation depth is 9.3m, the lateral wall of the foundation pit safety grade of grade I, foundation pit supporting structure layout shown in figure 1. Figure 1 pit supporting structure layout (2) the surroundings around foundation pit The station on the north side of the structure along the sideline at 3.5m distance of cable trench, ditch width 1.2m, depth of 1.5m, built more than 30 communication cables; the other side of the open field conditions. (3) the geological condition According to the geological exploration data, pump house stratum distribution see table 1: List of Table 1 strata distribution pump house Rock and soil. origin state Thickness distribution (m) Cohesion (kPa) internal friction angle (~) Plain fill Qml Slightly compaction Three point five Twelve Fifteen mucky soil Qal Soft plastic One point four Six point three Six point two Silty clay Qal Plastic Three point two Twenty-two point nine Twenty-three point three Sandy clay Qel Hard plastic Thirteen point two Twenty-four point eight Twenty-two p

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档