江中学教学楼、食堂脚手架工程加固措施(Reinforcement measures for scaffolding works of teaching buildings and dining halls in Jiang middle school).docVIP

江中学教学楼、食堂脚手架工程加固措施(Reinforcement measures for scaffolding works of teaching buildings and dining halls in Jiang middle school).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
江中学教学楼、食堂脚手架工程加固措施(Reinforcement measures for scaffolding works of teaching buildings and dining halls in Jiang middle school)

江中学教学楼、食堂脚手架工程加固措施(Reinforcement measures for scaffolding works of teaching buildings and dining halls in Jiang middle school) Mulberry shadow oblique spring up to every family scattered, intoxicating. Snow dark with ice spring shoots drops to willow to steal. To cross the Yellow River ice jam Sichuan, will climb the Taihang mountains snow mountain. Science alone without friends, is solitude and smell. And, at the same time. Reinforcement measures for scaffolding works of teaching buildings and dining halls in Jiang middle school Because the qualified rate of the steel pipe scaffold fastener is 10%, the scaffold of the project is reinforced, and the scaffold is changed into less than 12 meters, and the double upright rod is used, and the utility model is still single upright for more than 12 meters. An additional fastener is added at the increase of the upright pole and a fastener is added at each end of the brace to reinforce the handle. We will give the following statement: The calculation of steel pipe scaffold refers to the technical specification for construction of fastener type steel pipe scaffold (JGJ130-2001). The calculation of scaffolding for double scaffolding, erection of a height of 18 meters, 12 meters below the use of double pipe vertical pole, more than 12 meters using a single pipe vertical pole. Erection dimensions are: the vertical distance of the vertical rod is 1.80 meters, the vertical distance of the pole is 1.20 meters, and the step of the vertical rod is 1.80 meters. The adopted steel tube type is 48 * 3.5, and the wall member adopts 2 steps and 3 spans, with a vertical spacing of 3.60 meters and a horizontal distance of 5.40 meters. The construction uniform load is 2.0kN/m2, meanwhile, the construction of 2 layers, the foot board is laying 4 layers. I. calculation of large cross bar: The big beam is calculated according to the strength and deflection of the three span continuous beam, and the big bar is above the small cross bar. The maxim

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档