钢筋混凝土预制桩打桩工艺标准(203-1996)(Standard for piling process of reinforced concrete precast pile (203-1996)).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢筋混凝土预制桩打桩工艺标准(203-1996)(Standard for piling process of reinforced concrete precast pile (203-1996))
钢筋混凝土预制桩打桩工艺标准(203-1996)(Standard for piling process of reinforced concrete precast pile (203-1996))
Range
This standard is applicable to the construction of precast reinforced concrete piles in industrial and civil buildings
Construction preparation
2.1 materials and main equipment:
2.1.1 precast reinforced concrete pile: specifications and quality must comply with the design requirements and construction specifications, and have the factory certificate.
2.1.2 electrode (with pile): model, performance must comply with the design requirements and the relevant standards, the general use of E4303 brand.
2.1.3 steel (pile used): material, specifications meet the design requirements, should use low carbon steel.
2.1.4 main machines are: diesel pile driver, welding machine, pile cap, and pile driving trolley. Wire rope, wire rope, steel plate or steel and wooden folding ruler and so on.
2.2 operating conditions:
2.2.1 pile axis and elevation have been measured and organized through the pre inspection procedures. The pile shaft and the elevation of the control pile should be set up where the pile is not affected and should be properly protected.
2.2.2 deals with obstacles in the upper air and underground. In the case of the use or safety of adjacent buildings or structures, effective measures shall be taken to deal with the units concerned.
According to 2.2.3 released pile axis line, with a wooden peg or a steel screw pile, and lime as an indicator for the injections.
2.2.4 site should be rolled and leveled, and the drainage is smooth, so as to ensure the movement and stability of the pile machine.
2.2.5 test pile. Piles must be tested before construction, with less than 2 pieces of wood. Determine penetration, and verify piling equipment, construction technology and technical measures are appropriate.
2.2.6 shall select and determine the entry and exit routes and piling sequences of the piling machine, formulate construction plans, and make technical disclosure.
Operatio
您可能关注的文档
- 论当代农民法治意识的重塑(On the reshaping of Contemporary Peasants' rule of law consciousness).doc
- 论我国企业市场营销道德(On enterprise marketing ethics in China).doc
- 论建筑工程施工过程中的质量控制(Quality control in construction process).doc
- 论文资料网站索引(Paper information website index).doc
- 论推动科技进步与加强科技法律制度的关系(On the relationship between promoting scientific and technological progress and strengthening the legal system of science and technology).doc
- 论点严谨5(Rigorous argument 5).doc
- 论文偶记_译文(This paper take the _).doc
- 论环设计中形态与形态色调对心理影响(The influence of form and form and hue on psychology in ring design).doc
- 论物权法中物权和债权的区分(On the distinction between real right and obligatory right in the law of real right).doc
- 论语赏析(Appreciation of Analects).doc
文档评论(0)