大工11秋《道路工程》在线作业1(In autumn 11 road project online homework 1).docVIP

大工11秋《道路工程》在线作业1(In autumn 11 road project online homework 1).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工11秋《道路工程》在线作业1(In autumn 11 road project online homework 1)

大工11秋《道路工程》在线作业1(In autumn 11 road project online homework 1) Great works 11 autumn road works online homework 1 First, a radio question 1. in the following sections, it is not appropriate to carry out subgrade construction during the rainy season. A. gravel road section B. cut abandoned road section C. expansive soil section Sandy soil section in hilly area of D. The correct answer: C 2. the dry and wet type of subgrade indicates the wet and dry state of Subgrade in (). A. most unfavorable season B. most favorable season C. any season D. or more of the answers are incorrect The correct answer: A 3. the indirect protection is the protection of embankment along the river embankment. A. stone cage B. retaining wall C. stone masonry D. dam The correct answer: D 4. before embankment filling, the minimum strength and () shall be determined by soil sampling test. A. maximum particle size B. mean particle size C. CBR value D. coefficient of loose paving The correct answer: A 5., soil cut mixed mining method refers to () mixed use. A. multilayer transverse full width mining method and layered longitudinal excavation method B. single layer transverse full width excavation method and layered longitudinal excavation method C. multilayer transverse full width mining method and channel longitudinal excavation method D. single layer transverse full width mining method and sectional longitudinal excavation method The correct answer: C 6. a roadbed replacement construction, the replacement depth is 2m, the groundwater level is below 1.8 2.0m, and the aquifer below is the impermeable layer. In order to reduce and intercept ground water, it is necessary to set (). A. seepage well B. Rapids C. evaporation tank D. stone ditch The correct answer: D 7. a grade two highway, in which a section of embankment passes through the corner of Hutang, length 51m, the soft soil thickness of the subgrade is about 0.5m, and it is more reasonable to use () to deal with the soft soil. A. drainage sand

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档