- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
定型组合钢摸板的安装与拆除(Installation and removal of type steel plate touch)
定型组合钢摸板的安装与拆除(Installation and removal of type steel plate touch)
Compilation according to concrete structure quality acceptance specification GB50204-2002, in which the bold part of the mandatory provisions, must be strictly enforced. I. construction preparation
1. materials
(1) the composite steel formwork is composed of steel mould and fittings.
1) plane template specifications
Length: 450mm, 600mm, 750mm, 900mm, 1200mm, l500mm.
Width: 100mm, l50mm, 200mm, 250mm, 300mm.
2) shape steel corner die: negative angle die and angle die.
3) connecting attachments: U type, L type, type 3, fastener, dish type fastener, hook bolt, through wall bolt, fastening bolt.
4) support system: column hoop, steel beam, steel tube wall, wood brace hoop, door type scaffold, adjustable steel top, adjustable
Bracket, steel truss, timber.
5) release agent.
(2) SP a template series of materials (that is, steel is made of bamboo plywood surface template)
1) template specifications
Length: 900mm, 1200mm, l500mm.
Width: 200mm, 300mm, 600mm.
Thickness: 55mm, 70mm.
2) shaped steel angle die: movable hinge die, joint angle die, modification connection angle die, fixed negative angle die.
3) connecting accessories: steel pipe, square card card, wedge bolt, wall bolt, bolt.
4) support system: the column hoop, hoop steel wall, steel tube, door type scaffold, adjustable steel top, adjustable upper support, steel truss
Fang, wood frame, wood.
5) release agent.
2. operating conditions
(1) template design has been completed, there are template design drawings.
(2) the template shall be numbered according to the section and coated with the release agent, and shall be piled up in different specifications.
(3) according to the design drawing of the template, place the axis and the edge of the template, the mouth position and the horizontal control elevation, and the bottom of the wall and column template should be made of cement mortar leveling layer.
(4) the wall column reinforcement is finished, the wate
您可能关注的文档
- 第6章 ATmega 单片机模拟接口和使用方法134~159.ppt
- 第7章复杂适应系统理论和其应用.ppt
- 第8章 卤代烃和亲核取代反应.ppt
- 第7章 语音传输和内容网络设计.ppt
- 第9章 第二节负荷电流和电压损失计算.ppt
- 第9章 羧酸和其衍生物.doc
- 第9章羧酸和衍生物习题答案.ppt
- 第一单元氯、溴、碘和其化合物第二节氯气性质.ppt
- 第一章 软件工程现状和发展.ppt
- 第一节 传染病和其预防 第二节 免疫与计划免疫导学案.doc
- 小学科学教育中工程设计与学生创新实践能力培养的路径与实践探索论文.docx
- 校园网络安全管理中的网络安全教育与网络安全人才培养体系研究论文.docx
- 初中体育单元教学目标与运动技能训练的实践研究论文.docx
- 高中生态环保:校园绿植在室内空气质量改善中的应用探讨论文.docx
- 基于科技展览的小学科学素养培养策略研究论文.docx
- 初中英语阅读教学中班级图书角应用与阅读策略培养研究论文.docx
- 小学法治教育案例教学中的问题解决能力培养研究论文.docx
- 初中数学“数学竞赛与创意数学问题设计”教学策略论文.docx
- 高中环境教育:校园植物多样性保护与生态保护行动计划论文.docx
- 城市绿化与小学生身心健康关系研究:以某城市为例论文.docx
文档评论(0)