- 8
- 0
- 约 10页
- 2017-08-20 发布于河南
- 举报
土石坝设计案例(Dam design case)
土石坝设计案例(Dam design case)
Case 2 reinforcement design of Lixian Sifang bridge earth rock dam
1 engineering tasks and scales
.1.1 reservoir overview
Sifang bridge reservoir is located in the Hunan province of Lixian, is a tributary of Lishui censhui River, located in northern Lixian Wangjiachang hub Town, location of longitude 111 degrees north latitude and 29 degrees 15 , 34, from the Lixian county about 30km. Sifang reservoir started construction in 1958 and was completed and put into operation in 1974. It is a small (1) reservoir with irrigation as the main part and comprehensive benefits of
您可能关注的文档
- 学科渗透 典型例题(A typical example of discipline penetration).doc
- 学龄前儿童所需的营养(For preschool children s nutrition).doc
- 孩子们的游戏(The children's games).doc
- 学好数学和语文的方法(Way to learn math and language).doc
- 学习熟练使用缝纫机(Learning proficiency in the use of sewing machine).doc
- 宁德港简介(The port of Ningde.).doc
- 它激式电源盒维修(The flyback power supply box maintenance).doc
- 宁波市高层民用建筑设计防火自审专篇(Ningbo city fire protection design of high-rise buildings from the special articles).doc
- 安全员考试(Exam security officer).doc
- 安全教案(Safety plan).doc
原创力文档

文档评论(0)