- 8
- 0
- 约 10页
- 2017-08-20 发布于河南
- 举报
土石坝设计案例(Dam design case)
土石坝设计案例(Dam design case)
Case 2 reinforcement design of Lixian Sifang bridge earth rock dam
1 engineering tasks and scales
.1.1 reservoir overview
Sifang bridge reservoir is located in the Hunan province of Lixian, is a tributary of Lishui censhui River, located in northern Lixian Wangjiachang hub Town, location of longitude 111 degrees north latitude and 29 degrees 15 , 34, from the Lixian county about 30km. Sifang reservoir started construction in 1958 and was completed and put into operation in 1974. It is a small (1) reservoir with irrigation as the main part and comprehensive benefits of flood control and cultivation. Design irrigation area of 4000 mu, of which 2900 acres of paddy fields, 1100 acres of dry land, irrigation design guarantee rate of 75%, the benefit areas include the royal family factory, town and other 5 units. The water surface area of the reservoir can be raised to 166 mu.
Square area is 4.073k square meters control dam bridge reservoir, the total capacity of 1 million 654 thousand and 600 m3, the normal water level of the reservoir is 88.53m, the corresponding normal capacity of 1 million 390 thousand m3. The reservoir is a small (1) reservoir, belonging to IV and other projects. The main buildings are grade 4, and the secondary buildings are 5. Reservoir junction project consists of dam, spillway and irrigation culvert. The dam is a homogeneous earth dam, crest elevation 92.00m, 14.27m high dam, crest width 5.3m, the axial length of 356m, the upper slope ratio is 1:2.5. The downstream dam slope is divided into three levels, the first level from 92.00m to 85.00m elevation, slope is 1:2.0, a platform, platform width 6.0m; second from 85.00m to 81.50m elevation, slope is 1:2.5, a platform, platform width 8.0m. Third from 81.50m to 79.80m, the lower slope elevation is 77.73, slope of 2.0m high rockfill drainage.
In the spillway on the right bank of the dam, to open wide and shallow spillway and overflow weir crest elevation 88.53m, width 22.0m,
您可能关注的文档
- 学科渗透 典型例题(A typical example of discipline penetration).doc
- 学龄前儿童所需的营养(For preschool children s nutrition).doc
- 孩子们的游戏(The children's games).doc
- 学好数学和语文的方法(Way to learn math and language).doc
- 学习熟练使用缝纫机(Learning proficiency in the use of sewing machine).doc
- 宁德港简介(The port of Ningde.).doc
- 它激式电源盒维修(The flyback power supply box maintenance).doc
- 宁波市高层民用建筑设计防火自审专篇(Ningbo city fire protection design of high-rise buildings from the special articles).doc
- 安全员考试(Exam security officer).doc
- 安全教案(Safety plan).doc
- 人教版八年级上册历史精品教学课件 第六单元 中华民族的抗日战争 第17课 七七事变与全民族抗战 (6).ppt
- 人教版八年级上册历史精品教学课件 期末专题复习 专题二 中国人民近代化的探索 (2).ppt
- 人教版八年级上册历史精品教学课件 第二单元 近代化的早期探索与民族危机的加剧 第5课 甲午中日战争与列强瓜分中国狂潮 (2).ppt
- 人教版八年级上册历史精品教学课件 第七单元 人民解放战争 大概念引领下的大单元复习 (4).ppt
- 人教版八年级上册历史精品教学课件 第七单元 人民解放战争 第21课 人民解放战争的胜利 (2).ppt
- 人教版八年级上册历史精品教学课件 第三单元 资产阶级民主革命与中华民国的建立 第10课 中华民国的创建 (2).ppt
- 人教版八年级上册历史精品教学课件 第四单元 新民主主义革命的开始 第12课 新文化运动 (3).ppt
- 第四组塑料低温脆化温度测试详解演示文稿.ppt
- 第消费者行为演示文稿.ppt
- 第一部分用搜索方法求解问题演示文稿.ppt
原创力文档

文档评论(0)