- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土石坝设计案例(Dam design case)
土石坝设计案例(Dam design case)
Case 2 reinforcement design of Lixian Sifang bridge earth rock dam
1 engineering tasks and scales
.1.1 reservoir overview
Sifang bridge reservoir is located in the Hunan province of Lixian, is a tributary of Lishui censhui River, located in northern Lixian Wangjiachang hub Town, location of longitude 111 degrees north latitude and 29 degrees 15 , 34, from the Lixian county about 30km. Sifang reservoir started construction in 1958 and was completed and put into operation in 1974. It is a small (1) reservoir with irrigation as the main part and comprehensive benefits of flood control and cultivation. Design irrigation area of 4000 mu, of which 2900 acres of paddy fields, 1100 acres of dry land, irrigation design guarantee rate of 75%, the benefit areas include the royal family factory, town and other 5 units. The water surface area of the reservoir can be raised to 166 mu.
Square area is 4.073k square meters control dam bridge reservoir, the total capacity of 1 million 654 thousand and 600 m3, the normal water level of the reservoir is 88.53m, the corresponding normal capacity of 1 million 390 thousand m3. The reservoir is a small (1) reservoir, belonging to IV and other projects. The main buildings are grade 4, and the secondary buildings are 5. Reservoir junction project consists of dam, spillway and irrigation culvert. The dam is a homogeneous earth dam, crest elevation 92.00m, 14.27m high dam, crest width 5.3m, the axial length of 356m, the upper slope ratio is 1:2.5. The downstream dam slope is divided into three levels, the first level from 92.00m to 85.00m elevation, slope is 1:2.0, a platform, platform width 6.0m; second from 85.00m to 81.50m elevation, slope is 1:2.5, a platform, platform width 8.0m. Third from 81.50m to 79.80m, the lower slope elevation is 77.73, slope of 2.0m high rockfill drainage.
In the spillway on the right bank of the dam, to open wide and shallow spillway and overflow weir crest elevation 88.53m, width 22.0m,
您可能关注的文档
- 学科渗透 典型例题(A typical example of discipline penetration).doc
- 学龄前儿童所需的营养(For preschool children s nutrition).doc
- 孩子们的游戏(The children's games).doc
- 学好数学和语文的方法(Way to learn math and language).doc
- 学习熟练使用缝纫机(Learning proficiency in the use of sewing machine).doc
- 宁德港简介(The port of Ningde.).doc
- 它激式电源盒维修(The flyback power supply box maintenance).doc
- 宁波市高层民用建筑设计防火自审专篇(Ningbo city fire protection design of high-rise buildings from the special articles).doc
- 安全员考试(Exam security officer).doc
- 安全教案(Safety plan).doc
文档评论(0)