- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
模钳1(Die clamp 1)
模钳1(Die clamp 1)
1. in the part assembly process, the final naturally formed size is called (assembly dimension chain)
2. thermal expansion in physical fixation is the use of material (thermal expansion, contraction) characteristics of fastening
3. in the mold assembly, the assembly accuracy is not entirely dependent on the assembly accuracy of parts assembly method is called (incomplete exchange method)
4. chemical fixation method according to the adhesive has (epoxy resin bonding method) and (inorganic resin bonding method) and (anaerobic adhesive bonding method) and so on
5., with the guide die assembly, can be used to assemble the standard parts of the guide plate (convex touch) and (concave touch), as well as convex and concave mold
In the 6. compound die, the concave convex die not only plays the role of blanking punch, but also plays the role of punching die
7. stamping die in the press should be installed on the first (touch) part, then install (touch) part
8. test mold, the mold installed in the equipment should be carried out (no-load operation) to ensure that all moving parts are normal
9. mold installation by the mould lifting, small and medium sized mold should be used (overall) lifting
10. the main contents of the die inspection are around the quality defects of the parts to check the problems on the mold
11., in actual production, the viscosity (viscosity) is often used as the main sign of lubricant selection
12. after the die assembly, in order to ensure the clamping force, after assembly, the locking block and the slide block slope contact, leaving the gap between the parting surfaces (0.2mm) for repair
13. the working parts of the die are damaged and there are two kinds of wear and tear
14. small punch in the use of damage easily occur (broken) and (bending)
15. the cooling methods commonly used in die casting die are air cooling and water cooling
16. after mold maintenance, must be carried out (debugging) and (test), until the qualified parts can
您可能关注的文档
- 新闻采访16种常见导语(16 common leads for news interviews).doc
- 新鲜事(Something new).doc
- 新编大学英语第三版综合教程2课后翻译(A new comprehensive edition of College English third, 2 after class translation).doc
- 方与圆2(Square and circle 2).doc
- 方剂方歌(Prescription recipe).doc
- 方正排版简易教程(Simple tutorial of Founder typesetting).doc
- 施 工 合 同 书(Construction contract).doc
- 施工员工作总结范文(Builder's work summary).doc
- 施工员工作总结(Construction worker summary).doc
- 施工员现场常识(General knowledge of construction workers).doc
- 2018年6.9湖北省年度招募选派三支一扶考试真题及答案.pdf
- 2021年全国招募选派“三支一扶”高校毕业生考试《综合能力测试》真题及答案.docx
- 2017年全国导游资格证《导游基础知识》考试真题及答案.pdf
- 2018年全国导游资格证《导游基础知识》考试真题及答案.docx
- 2018年6.9湖北省年度招募选派三支一扶考试真题及答案.docx
- 生活垃圾焚烧电厂危险源辨识(77页).pptx
- 2019年全国导游资格证《导游基础知识》考试真题及答案.docx
- 2024年全国多省高校毕业生“三支一扶”计划招募考试《职业能力测验》真题及答案.pdf
- 2021年内蒙古高校毕业生“三支一扶”社区民生工作招募考试《综合能力测试》考试真题及答案.docx
- 2019年全国导游资格证《导游基础知识》考试真题及答案.pdf
文档评论(0)