网站大量收购独家精品文档,联系QQ:2885784924

施工员工作总结(Construction worker summary).doc

施工员工作总结(Construction worker summary).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员工作总结(Construction worker summary)

施工员工作总结(Construction worker summary) Job responsibilities of construction staff: To carry out the work under the direct leadership of the project manager, carry out the principle of safety and prevention first, according to the provisions of the safety precautions, the safety work carried out to achieve efficiency must be security, we must first grasp the production safety catch. Be familiar with construction drawings, draw up all construction organization design plan and construction safety, quality and technical plan, prepare individual project schedule, manpower and material resource plan and machine tools, equipment and equipment plan. To organize and organize staff meetings on a regular basis to study, arrange and guide scientifically and successfully accomplish all construction tasks of the project. Cooperate with the project manager, and earnestly fulfill the terms of the construction contract, ensure the smooth progress of construction, and maintain the credibility and economic interests of the enterprise. Preparation of civilized site implementation plan, according to the construction site reasonable planning, layout, site plan, arrangements, implementation and construction of civilized sites. Prepare the overall schedule and monthly schedule of the project, and monthly progress schedule of each construction team. In the sub contracting cost accounting (according to individual and partial) separate timely accounting, and accounting results promptly notify the contractor management personnel, so as to improve the construction plan and scheme, striving for higher efficiency. Each team issued construction assignment and material requisition quota. Work with project manager to push construction materials and equipment in on time and in good condition to ensure smooth progress of the project. To participate in the completion and acceptance of the works, responsible for the complete protection of the works. Reasonable allocation of factors of production, strict o

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档