- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工员工作总结(Construction worker summary)
施工员工作总结(Construction worker summary)
Job responsibilities of construction staff:
To carry out the work under the direct leadership of the project manager, carry out the principle of safety and prevention first, according to the provisions of the safety precautions, the safety work carried out to achieve efficiency must be security, we must first grasp the production safety catch.
Be familiar with construction drawings, draw up all construction organization design plan and construction safety, quality and technical plan, prepare individual project schedule, manpower and material resource plan and machine tools, equipment and equipment plan.
To organize and organize staff meetings on a regular basis to study, arrange and guide scientifically and successfully accomplish all construction tasks of the project.
Cooperate with the project manager, and earnestly fulfill the terms of the construction contract, ensure the smooth progress of construction, and maintain the credibility and economic interests of the enterprise.
Preparation of civilized site implementation plan, according to the construction site reasonable planning, layout, site plan, arrangements, implementation and construction of civilized sites.
Prepare the overall schedule and monthly schedule of the project, and monthly progress schedule of each construction team.
In the sub contracting cost accounting (according to individual and partial) separate timely accounting, and accounting results promptly notify the contractor management personnel, so as to improve the construction plan and scheme, striving for higher efficiency.
Each team issued construction assignment and material requisition quota. Work with project manager to push construction materials and equipment in on time and in good condition to ensure smooth progress of the project.
To participate in the completion and acceptance of the works, responsible for the complete protection of the works.
Reasonable allocation of factors of production, strict o
您可能关注的文档
- 壁纸叫板乳胶漆(Wallpaper challenge latex paint).doc
- 声律启蒙(Sound of Enlightenment).doc
- 战场女武神3 兵种熟练度(Battlefield skills of 3 armed women).doc
- 战后德国贸易(Postwar German trade).doc
- 截句(four-line poem with the third line blank).doc
- 戴尔1520bios(戴尔1520bios).doc
- 房产专有名词(Real estate terminology).doc
- 房地产专业知识200问(上)(200 questions on real estate professional knowledge (Part I)).doc
- 戳脚门绝技(Stamp foot stunt).doc
- 房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)