房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control).docVIP

房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control)

房地产公司造价人员怎样进行成本控制(How does the Real Estate Company cost control) How does the Real Estate Company cost control? I have been working in the real estate development company for several years, and I have been working in the office for two years. I have a set of experience about the cost control of the development company. Now I analyze it in several stages. 1, the feasibility study stage: feasibility study of our cost personnel involved in the general case of the situation is not a lot, but I think the responsibility should put forward some useful suggestions, such as the project site, seven leveling, geological conditions and possible rain Ji Shijian, time and so on, the general situation for the feasibility study of people what is not considered in detail, but these will have an impact on the cost of the project, once you ask whether they adopted or not, after the occurrence of related issues you have prepared, and the feasibility of research in reserve and unforeseen expenses and cost; I think this stage cost control accounted for 5% 2, design stage: general books say that design can control the project cost 70%, but I think this analysis is not possible, the first design units may not do what the quota design, their starting point is the design of safe and reliable reasonable and durable, while saving the cost is secondary, in other words, construction you dont have money units also developed what real estate? Second even if the construction unit cost personnel strength is very strong and can reflect the drawings quickly, found that more than limit a lot, so the designer to modify the drawings also need a psychological process and inspection process, and to a drawing need time, next to the construction unit construction supervision bidding process will be pre-sale and interference. The financial cost will improve day by day, the construction unit will not be so clever to do that, so the quota design for most real estate development units are empty words, tell the d

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档