- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价师继续教育试题答案03(Cost engineer continuing education questions answer 03)
造价师继续教育试题答案03(Cost engineer continuing education questions answer 03)
First questions (2 points)
China implemented in December 1, 2008 (D), is in line with Chinas overall reform of the project cost management objectives, in line with the state macro-control, market competition, the formation of the principle of price. (P81)
A. standard for valuation of bill of quantities for construction projects GB80500-2003
B. standard for valuation of bill of quantities for construction projects GB80500-2008
C. standard for valuation of bill of quantities for construction projects GB50500-2003
D. standard for valuation of bill of quantities for construction projects GB50500-2008
Second questions (2 points)
If the employer pays the progress of the project, it shall measure and pay the payment period (C) in accordance with the contract. (P1:40)
A. is longer than the measurement cycle
B. is shorter than measurement cycle
C. equivalent metering cycle
D. has nothing to do with the measurement cycle
Third questions (2 points)
After the bid evaluation committee has completed the bid evaluation report, it shall submit a written bid evaluation report to the tenderee. The bid evaluation report is signed by (C). P170
A. tender representative
B. head of bid evaluation committee
C. all members of the bid evaluation committee
D. bid evaluation committee representative
Fourth questions (2 points)
At the same time, the French government issued a mandatory regulation on energy conservation, and also introduced a series of economic incentives to implement the policy of energy conservation. The following economic incentives are (C). P193
A. government agencies, industry associations, energy companies and other relevant departments in building energy saving in each department is responsible for the formation of a good operation mode.
B. manufacturers continue to improve the performance of energy-saving products, reduce costs and prices, so that building energy efficiency levels continue to improve.
您可能关注的文档
- 英语专业八级 语言学 总结(Eight level linguistics summary of English Major).doc
- 英雄无敌5详细攻略(Heroes and Heroes 5 details).doc
- 茶企老板要读一读《论语》(The boss of tea enterprise wants to read the Analects of Confucius).doc
- 茶 资料(Tea materials).doc
- 茵陈蒿汤醇提物对机体抗氧化能力影响(Effect of the alcohol extract of Yinchenhao Decoction on antioxidant ability).doc
- 茶楼文化与经济管理(Teahouse culture and economic management).doc
- 茶叶知识大全(Tea knowledge).doc
- 茶文化(tea culture).doc
- 茶室(Teahouse).doc
- 茶艺·茶道·茶文化---品读茶文化(Tea ceremony, tea ceremony and tea culture --- reading tea culture).doc
- 速卖通英语模板(Quick sell English template).doc
- 道破天机(Reveal the secret).doc
- 道路工程英语词汇(English vocabulary for road engineering).doc
- 道路工程词汇(Glossary of road works).doc
- 遗传学中易混淆概念的辨析(Differentiation and analysis of confusing concepts in genetics).doc
- 遗传学名词解释(Genetic terminology explanation).doc
- 遥控器的维修(Maintenance of remote control).doc
- 遥控器维修(Remote control maintenance).doc
- 遥控系统的设计(Design of remote control system).doc
- 避免购房陷井.doc
最近下载
- 2025-2026年国家公务员考试《申论》真题及参考答案.doc VIP
- 川教版(2019)初中信息科技Python编程复习单.docx VIP
- DTII(A)带式输送机计算书(带表1-4)Ver1.2(95版)(2012.12.18).xls VIP
- 医疗器械经营财务管理培训.pptx VIP
- 麻醉前肺功能评估.ppt VIP
- 新课标体育与健康水平二教案.pdf VIP
- 贵州教育出版社小学五年级上册综合实践教案.pdf VIP
- 博物馆学概论课件:博物馆藏品管理历史、藏品意义与藏品研究.pptx VIP
- 2025高中政治部编版选择性必修二《法律与生活》必背法律条文.pdf VIP
- SEO培训课件教学课件.pptx VIP
文档评论(0)