- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
sang(唱歌)
sang(唱歌)
Construction organization design
1 compilation basis
1.1 project bidding plan
1.2 contract of construction contract number: Beijing contract No.
1.3 design and construction drawings, engineering number: 97A29
1.4 geotechnical engineering investigation report (97, technique 071)
1.5 national standards and standards for construction and acceptance of construction works:
Specification for construction and acceptance of concrete structure engineering (GB 5020492)
Specification for construction and acceptance of underground waterproof Engineering (GBJ 20883)
Specification for construction and acceptance of building ground engineering (GB 5020995)
The reinforced concrete structure of the high-rise building construction procedures (JGJ 391)
Technical code for roof engineering (GBJ 5020794)
Standard for quality inspection and assessment of building construction (GBJ 30188)
Construction procedure for winter construction (JGJ 104-97)
Ribbed steel sleeve compression connection technical specification (JGJ 10896)
Specification for welding and acceptance (JGJ 1896)
Technical specification for glass curtain wall engineering (JGJ 10296)
Specification for construction engineering measurement (DBJ 012195)
The construction process of Building Engineering (DBJ012696)
Construction safety inspection standard for evaluation (JGJ5999)
1.6 national and XX regulations and regulations
2 project overview
This project is developed by XXXX and designed by XX company. Project is located in XX, the construction site, convenient transportation, location in XX road. The construction of the project is less than 0 and the structure and decoration of 0 or more two contract sections, with an interval of 2 months. In view of this situation, the content of this design is considered in two stages.
Architectural profile: this project is a high-rise integrated commercial and residential building with a flat surface. The total construction area is 40095.4m2, of which the underground part is 11500 m2
您可能关注的文档
- css文字控制(CSS text control).doc
- css的伪元素(Pseudo elements of CSS).doc
- css的几个基本要素(手机阅读)(Several basic elements of CSS (mobile phone reading)).doc
- css颜色及背景属性(CSS color and background properties).doc
- css样式参照(CSS style reference).doc
- cs地图制作天书(Mumbo-jumbo CS map).doc
- c时代管理新课题(New issues of management in C Era).doc
- cs地图制作(CS map making).doc
- css规则(Css规则).doc
- c解线性方程组(C solving linear equations).doc
- qq能登陆,ie打不开(QQ can login, ie can not open).doc
- rac 重新安装节点1过程记录(RAC reinstall node 1 process log).doc
- sa().doc
- seal铁匠收集大全(seal铁匠收集大全).doc
- sbei(SBEI).doc
- sensipar(cinacalcet)盐酸西那卡塞片中文说明(Sensipar (cinacalcet) of cinacalcet tablets that Chinese).doc
- seo的方向和心态(SEO's direction and mentality).doc
- shave笔记(shave笔记).doc
- seowhy培训vip资料-基础篇(Seowhy training VIP data - Basic articles).doc
- shell中符号意义(Symbolic meaning in shell).doc
文档评论(0)