新房装修步骤及注意事项(详细)(Bridal decoration steps and attention (detail)).docVIP

新房装修步骤及注意事项(详细)(Bridal decoration steps and attention (detail)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新房装修步骤及注意事项(详细)(Bridal decoration steps and attention (detail))

新房装修步骤及注意事项(详细)(Bridal decoration steps and attention (detail)) Bridal decoration steps and attention (detail) 2012-1-17 1 Preliminary Design: 2 main Chaigai - 3 - 4 - 5 hydropower transformation woodworking tiling - 6 brush wall paint - 7 - 8 - Dalabo cabinets installed 9 doors installed 10 floor installation - 11 Putie Wallpaper - 12 radiator installation -- 13 switch socket installation - 14 lamp installation - 15 hardware sanitary ware installation 16 curtain rod installation - 17 - 18 - Pioneer cleaning furniture into 19 - 20 Home Furnishing appliance installation accessories 1, preliminary design: mainly according to their own habits and design, a detailed measurement of his room, we do not lazy, the best person measurements again, measurement of the content mainly includes: Clear the area involved decorate a process. Especially the tiling area, area of wall paint, wallpaper area, floor area; Clear main metope size. Especially after putting furniture to design the wall size. 2, the main Chaigai: enter the stage of construction, the main Chaigai is first on a project, mainly including wall, wall, shovel, and heating, for plastic steel windows and so on. The main Chaigai bluntly, the site is the first of the framework set up first. 3, water reform: before the water circuit transformation, the main structure of demolition should be basically complete. In the transformation and the main hydropower Chaigai between these two aspects, some students may know, also should be the first measurement cabinet. In fact, the so-called cabinet for the first time to measure and not what the actual content, because no metope and ground treatment, cabinet designer can not give a specific design size, and just the upper nozzle, lampblack machine socket developers reserved position, put forward some relevant suggestions. Including: See lampblack machine socket position effect after lampblack machine installation; Look at the location of the water meter is suitable; Look at the loca

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档