2011施工员考试试题复习资料(2011 construction staff exam questions review information).docVIP

2011施工员考试试题复习资料(2011 construction staff exam questions review information).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011施工员考试试题复习资料(2011 construction staff exam questions review information)

2011施工员考试试题复习资料(2011 construction staff exam questions review information) 2012 construction worker examination questions 2012 construction worker examination questions First, fill in the blanks (2 points per subject, 15 questions) 1, before admission, you must go through (), project department and team three level safety education. Answer: company. 2, admission must take safety card and (). Answer: helmet. 3, the cast-in-situ concrete pit when the groove depth is greater than (m) should be set in concrete chute. Answer: 3. 4, block, small die stacking height shall not exceed (m). Answer: 1.5 meters. 5, non floor scaffold structure, every side () layer should be set up a horizontal network. Answer: 4. 6, groove, pit Mizobe, 1 meters outside the pile height shall not exceed (m). Answer: 1.5 meters. 7, artificial excavation earthwork, two lateral spacing shall not be less than () meters. Answer: 2 meters. 8, oxygen bottles, acetylene bottles can not be inverted when using, two bottles of space shall not be less than 5 meters, the distance from open fire shall not be less than (meters). Answer: 10 meters. 9 、 the expansion joint and the back pouring belt must be protected with () cover plate in the construction. Answer: fixed. 10, construction site scaffolding should be () set up. Answer: timberman. 11, the attached scaffolding in ascending and descending operations, must set up () command personnel, unified command. Answer: 1. 12, scaffold work surface must () foot board. Answer: full shop. 13, when lapping the foot board, the lap length shall be no less than () cm. Answer: no less than 20 cm. 14, welding operations, the welding line () use other metal substitutes. Answer: can not. 15 、 the length of the power line of the primary side of the welding machine is not more than (meters). Answer: 5 meters. Two, multiple-choice questions (2 points per subject, a total of 12 questions) 1, undercooked lentils () to eat. 1) not 2) Answer: No. 2, paint industry site () for weld

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档