- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011施工员考试试题复习资料(2011 construction staff exam questions review information)
2011施工员考试试题复习资料(2011 construction staff exam questions review information)
2012 construction worker examination questions
2012 construction worker examination questions
First, fill in the blanks (2 points per subject, 15 questions)
1, before admission, you must go through (), project department and team three level safety education.
Answer: company.
2, admission must take safety card and ().
Answer: helmet.
3, the cast-in-situ concrete pit when the groove depth is greater than (m) should be set in concrete chute.
Answer: 3.
4, block, small die stacking height shall not exceed (m).
Answer: 1.5 meters.
5, non floor scaffold structure, every side () layer should be set up a horizontal network.
Answer: 4.
6, groove, pit Mizobe, 1 meters outside the pile height shall not exceed (m).
Answer: 1.5 meters.
7, artificial excavation earthwork, two lateral spacing shall not be less than () meters.
Answer: 2 meters.
8, oxygen bottles, acetylene bottles can not be inverted when using, two bottles of space shall not be less than 5 meters, the distance from open fire shall not be less than (meters). Answer: 10 meters.
9 、 the expansion joint and the back pouring belt must be protected with () cover plate in the construction.
Answer: fixed.
10, construction site scaffolding should be () set up.
Answer: timberman.
11, the attached scaffolding in ascending and descending operations, must set up () command personnel, unified command.
Answer: 1.
12, scaffold work surface must () foot board.
Answer: full shop.
13, when lapping the foot board, the lap length shall be no less than () cm.
Answer: no less than 20 cm.
14, welding operations, the welding line () use other metal substitutes.
Answer: can not.
15 、 the length of the power line of the primary side of the welding machine is not more than (meters).
Answer: 5 meters.
Two, multiple-choice questions (2 points per subject, a total of 12 questions)
1, undercooked lentils () to eat.
1) not 2)
Answer: No.
2, paint industry site () for weld
您可能关注的文档
- 2005年高考满分作文赏析惑(2005 college entrance examination essay Puzzle).doc
- 2005年上海综合管理专业考试真题答案详解(In 2005, Shanghai comprehensive management professional exam detailed answers).doc
- 2005年高考辽宁省数学试题(Liaoning college entrance examination mathematics examination questions in 2005).doc
- 2005闸北区初三物理模拟考试(2005 Zhabei District physics simulation exam).doc
- 2005-2006学年现代教育技术组工作计划(Working plan for the modern educational technology group in the 2005-2006 academic year).doc
- 2006~2007学年第二学期高一高二英语期末考试质量分析(Quality analysis of English final examination in the second semester of the 2006~2007 academic year).doc
- 2006学年度第一学期初一英语期末质量监控分析(Analysis of final English quality control in the first semester of the 2006 academic year).doc
- 2006年下半年程序员上午试题(The second half of 2006 programmers morning questions).doc
- 2006年度xx局机关效能建设总结(Summary of organ Effectiveness Construction of XX Bureau in 2006).doc
- 20062007学年度第二学期 target=_blank(The second semester of the 20062007 academic year target=_blank).doc
文档评论(0)