2012年二级建造师市政公用工程管理与实务考试试题答案(2012 two construction division municipal utility engineering management and practice examination questions answer).docVIP

2012年二级建造师市政公用工程管理与实务考试试题答案(2012 two construction division municipal utility engineering management and practice examination questions answer).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012年二级建造师市政公用工程管理与实务考试试题答案(2012 two construction division municipal utility engineering management and practice examination questions answer)

2012年二级建造师市政公用工程管理与实务考试试题答案(2012 two construction division municipal utility engineering management and practice examination questions answer) 2012 two construction division municipal utility engineering management and practice examination questions answer 1. rockery construction [A], to ensure stability and utility. A. from bottom to top, from back to front, from main to sub level B. bottom-up, from behind, forward, sub and main, layered C. from bottom to top, from front to back, from main to sub level D. from bottom to top, from front to back, from head to head, from head to head 2. rockery construction process is [D]. A. construction and dredging, base line, middle construction and closed bottom pull top B. construction and dredging, base line, pull the end of middle construction and sweep off closed top C. construction and dredging, base line, pull the end of middle construction and to close to the top of Gestalt and joint D. construction and dredging, base line, pull the end of middle construction and to close to the top and joint inspection, cloze 3. reinforced concrete Quito used to build under [B] rockery. A. Lake sandy land B. flowing water or uneven soil foundation C. dry areas D. better Subgrade 4. rockery cave structure does not include [C]. A. beam column B. cantilever beam type C. cantilever D. coupons arch 5. fold drop rockery process is divided into construction preparation, [BCDE] and other procedures. A. line channel B. layered construction C. rockery body D., Dengdao rockery, rockery tunnel construction E. art processing 6. rockery foundation commonly used materials [ABCD]. A. pile foundation B. stone foundation C. lime soil foundation D. reinforced concrete foundation E. cement Subgrade 7., the construction of rockery reinforced concrete foundation should pay attention to [ABCE] and the natural transition between the mountain and the ground. A. blank space B. planting C. seepage control D. embedment E. buried pipe 8. rockery bottom construction r

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档