2z102040施工成本控制与施工成本分析(2z102040 construction cost control and construction cost analysis).docVIP

2z102040施工成本控制与施工成本分析(2z102040 construction cost control and construction cost analysis).doc

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2z102040施工成本控制与施工成本分析(2z102040 construction cost control and construction cost analysis)

2z102040施工成本控制与施工成本分析(2z102040 construction cost control and construction cost analysis) 2Z102050 settlement of construction and installation costs (P95 ~ 105) 2Z102051 master the determination method of engineering change price (P95 ~ 97) I. The determination method of the engineering change price stipulated in the construction contract (model text): 3 cases (1) same rate Pure engineering quantity change: the original contract quantity is 1000m3, the ratio of the contract change is 20%, the actual project quantity is 2000 m3, and the budget contract unit price is 100 yuan / m3. How much is the settlement? (2) similar rates Example: C25 concrete, changed to C30 concrete (3) without the same, without similarity The contract price or price of the project has three kinds of circumstances: one is to apply directly; two is to apply indirectly; three is partially applied. Two, FIDIC construction contract conditions under the engineering change price determination method Three. The determination method of engineering change price stipulated in the bill of quantities valuation of construction projects The standard for valuation of construction bill of quantities stipulates that when the unit price of the contract needs to be adjusted due to the change of the quantity of the works, the contract shall be determined in accordance with the following measures unless otherwise agreed in the contract. 1. the list of new engineering bills caused by the omission of the bills of quantities or the design change shall be submitted by the contractor for the corresponding comprehensive unit price and shall be taken as the basis for settlement upon confirmation by the employer. 2. due to error or change the design of the engineering quantity increase or reduce the number of bill of quantities, the contract is within range, should carry out the comprehensive unit price of the original contract; is outside the range, the increased part of the project or after the reduction of the remaining

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档