- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
41个造价问题解析(Analysis of 41 cost problems)
41个造价问题解析(Analysis of 41 cost problems)
Analysis of 41 cost problems
1, the price of construction machinery have included mechanical installation fees and import field freight, also need to calculate large machinery demolition fee and freight yard?
Answer: the commonly used construction machinery unit, which includes mechanical installation fee itself and import freight field, but Jixietaiban large machinery and equipment, machinery itself does not contain the demolition charges and freight import field.
Therefore, the crane, pile machine, crawler machinery and other large mechanical equipment, the need for separate calculation of the security costs and fees.
2, the construction site did not install the meter, how can I deduct the utilities from the project?
Answer: accurate calculation can be detailed analysis of the water and electricity charges from the pre clearing book, according to the amount of water and electricity charges deducted, so that the calculation is more accurate, but the amount of work required to do too much.
General local project cost management of this case deduction utilities have a coefficient of regulations, for example, a certain area is such a requirement: civil engineering according to the direct cost of thousands of seven net of utilities, including electricity for direct costs 4/1000, 3/1000 of the cost of water is directly. Installation project according to labor costs of seven point six percent out of the water and electricity charges, of which electricity is four point six percent of labor costs, water charges for labor costs three percent.
3. Where is the electricity charge in the quota? How should it be calculated?
Answer: quota tariff is in accordance with the Jixietaiban consumption calculation, including fees in machinery. Jixietaiban each item contained in the quota items, there are electricity content. That is to say, the price of electricity included in the machinery, do not need a separate calculation.
However, the construct
您可能关注的文档
- 2012三八妇女节优秀教师演讲稿(2012, 38 women's day, excellent teacher's speech).doc
- 2012中国图书馆学会年会(Annual meeting of China Library Association 2012).doc
- 2012个性签名(2012 personality signature).doc
- 2012.化农大纲(2012. agricultural programs).doc
- 2012会计职称考试《中级财务管理》复习股利政策与企业价值(2012, accounting title examination intermediate financial management review dividend policy and enterprise value).doc
- 2012印度(孟买)国际安防展(31-3)-网上宣传版(2012 India (Mumbai) International Security Exhibition (31-3) - online publicity Edition).doc
- 2011考研复试英语准备材料(2011 postgraduate exams English preparation materials).doc
- 2012如何自救(2012 how to help yourself).doc
- 2012学年上半年英语教学工作总结(A summary of English Teaching in the first half of the 2012 academic year).doc
- 2012学年上学期小队活动方案(Squad activity program for the 2012 school year).doc
最近下载
- [中级注册安全工程师考试密押资料]安全生产管理模拟194.docx VIP
- 某光伏项目危险源辨识与风险评价清单.pdf VIP
- [中级注册安全工程师考试密押资料]安全生产管理模拟197.pdf VIP
- 品管圈PDCA优秀案例-提高保护性约束使用的规范率医院品质管理成果汇报.pptx
- [中级注册安全工程师考试密押资料]其他安全(不包括消防安全)技术模拟7.docx VIP
- (优质医学)汇报用提高约束具规范使用率.ppt
- 英文版公司章程ARTICLES OF ASSOCIATION OF.docx VIP
- 2025年海南省中考物理试题卷(含答案解析).docx
- 公司章程英文版 Company Articles of Association.doc VIP
- 室内外照明线路敷设要点.ppt VIP
文档评论(0)