建筑节能资料(Building energy saving data).docVIP

建筑节能资料(Building energy saving data).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑节能资料(Building energy saving data)

建筑节能资料(Building energy saving data) Gan FA 2008 No. 8 Ganjingzi District Peoples government issued on 2008 The government work report for the tangible things for the project task decomposition and region Notice of the task decomposition refinement table The office of the streets, the district government departments and institutions: The 2008 Project for the tangible things and task decomposition zone in 2008 the government work report task decomposition refinement form industry through the research by the district government, is issued to you, please earnestly implement. Accessories: 1.2008 years of doing things for the project task decomposition 2.2008 years in the government work report task decomposition refinement table Two hours, eight years in January 25th Annex 1 In 2008 for the tangible things project task decomposition 1. before the implementation of closed city wetland park, Xiajia River waterfront park two, Blackstone Beach Park construction. The responsible departments: Urban Construction Bureau; with the Department: Dalian Bay, Ge Zhen Bao, Yingchengzi Street 2. completed a number of non property management in residential area road hard cover and green renovation project. Perfect lighting, seating, trash existing built in the park and other public facilities. The responsible departments: Urban Construction Bureau; with the Department: Street 3. configuration of buried cleaning cabinet 3800, 3 new public toilets, renovation of 3. The purchase of sanitation vehicles 8 units, the transformation of a number of refuse transfer point. The responsible departments: Urban Construction Bureau 4. road tunnel, Lushun Road, Binhai Road Hongling (GE Zhen Bao section) construction and Arthur Road (CAI Da Ling River Estuary to the section), Lushun Road (the airport to xinzhaizi section) pavement repair project, starting two, Pearl Road, Binhai Road (Yingchengzi section) project. Transformation of Township Road 31.6 km. The implementation of a green project Pearl road.

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档