自动扶梯和自动人行道监督检验内容要求与方法(Requirements and methods for supervision and inspection of escalator and escalator).docVIP

自动扶梯和自动人行道监督检验内容要求与方法(Requirements and methods for supervision and inspection of escalator and escalator).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
自动扶梯和自动人行道监督检验内容要求与方法(Requirements and methods for supervision and inspection of escalator and escalator)

自动扶梯和自动人行道监督检验内容要求与方法(Requirements and methods for supervision and inspection of escalator and escalator) Appendix 1: Requirements and methods for supervision and inspection of escalator and escalator test project project number Inspection contents and requirements Inspection method One technique art Capital material 1.1* The manufacturing unit shall provide the following materials and documents: A. type test certificate (copy); General layout of b.; C. installation, use and maintenance instructions; D. electrical schematic diagram and wiring diagram and safety switch diagram. Data access 1.2* The installation unit shall provide: A. construction record and self inspection report; Incident records and processing reports during the installation of b.; C. installation process, by the use of units proposed by the manufacturing unit agreed to change design documents. Data access 1.3* The transformation (overhaul) units in addition to provide 1.2 requirements of the content, should also provide the transformation (overhaul) main component part of the list, certificate and test report, a copy of part of the transformation by the transformation unit and approved drawings and data signature. Data access 1.4* The use of units shall provide the registration and management system (such as fault state rescue operation rules, escalator or walkway key use storage system etc.) data and equipment technical documents (including 1.1, 1.2 and 1.3 of the required materials, fault and accident maintenance, routine inspection records etc.). When the new equipment is checked and accepted, only the operation management system is checked. Data access Two drive move and turn towards station Two point one The engine room and the steering station shall have at least one standing area of 0.3m2, with a length of not less than 0.5m on the smaller side and without any fixed equipment. Visual inspection, measuring tape when necessary Two point two When the main driving device or brake is arranged be

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档