图纸会审要点(Drawing points)
图纸会审要点(Drawing points)
1) Pre
A audit points
Design drawings and specifications are complete, there is no timetable for staging;
Size, general layout and construction drawing plane position, elevation is consistent, the
Whether the relationship between line drawing, the embedded part is clear;
Engineering structure, details, construction methods and technical requirements are clear, and there is no contradiction between the current rules and regulations, whether the economy is reasonable;
The quality requirements of building materials and sources are guaranteed;
Geological exploration data are complete, ground treatment method is reasonable;
Design of seismic intensity in compliance with local requirements;
The fire safety requirements are met, there is no public security fire department approval;
The construction safety is guaranteed;
Indoor and outdoor pipeline arrangement, the elevation is reasonable;
The requirements of design drawings and construction site can guarantee construction needs;
Engineering quantity calculation is correct;
To improve the design and construction of solutions.
2) professional examination
Each unit in A. Based on the design requirements, shall organize relevant personnel, professional division of reading documents, further understand the design intent, quality standards and technical requirements;
B. According to review the content of the professional, detailed drawings, check the problem, determine the current key.
3) content review
A. All units based on professional review on the organization of the professional and technical personnel to discuss, analyze and check between the professional drawings, check each other there is no contradiction, leakage;
B. A method is proposed for the treatment, solution or advice;
C. Problems and recommendations will be respectively documented, the internal supervision and the Contractor shall triage before by supervisor shall be timely submitted to the design contractor, in order to design the contrac
您可能关注的文档
最近下载
- 期末测试卷(试题)-2024-2025学年人教PEP版(2024)英语三年级上册.docx VIP
- 高二年级第一次月考质量分析化学.doc VIP
- 人教部编版小学语文三年级上册期中质量检测试题(答案+评分标准).pdf VIP
- 小红书2023“家生活”趋势白皮书-青年志&安娜&奥维云网-2023-64页.pdf
- 小学生主题班会 垃圾分类(课件).pptx
- 江西省南昌市八年级上学期期中数学试卷附参考答案.pdf VIP
- QC∕T 948-2013 汽车顶部装载装置.pdf
- 2024年浙江事业单位招聘-宁波慈溪市机关事业单位编外招5人考试备考题库及答案解析.docx VIP
- 风险评估及控制管理流程 2023年ISO15189医学实验室管理体系.docx VIP
- 滴灌在园林绿化中的应用及前景.doc VIP
文档评论(0)