图纸会审要点(Drawing points).doc

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
图纸会审要点(Drawing points)

图纸会审要点(Drawing points) 1) Pre A audit points Design drawings and specifications are complete, there is no timetable for staging; Size, general layout and construction drawing plane position, elevation is consistent, the Whether the relationship between line drawing, the embedded part is clear; Engineering structure, details, construction methods and technical requirements are clear, and there is no contradiction between the current rules and regulations, whether the economy is reasonable; The quality requirements of building materials and sources are guaranteed; Geological exploration data are complete, ground treatment method is reasonable; Design of seismic intensity in compliance with local requirements; The fire safety requirements are met, there is no public security fire department approval; The construction safety is guaranteed; Indoor and outdoor pipeline arrangement, the elevation is reasonable; The requirements of design drawings and construction site can guarantee construction needs; Engineering quantity calculation is correct; To improve the design and construction of solutions. 2) professional examination Each unit in A. Based on the design requirements, shall organize relevant personnel, professional division of reading documents, further understand the design intent, quality standards and technical requirements; B. According to review the content of the professional, detailed drawings, check the problem, determine the current key. 3) content review A. All units based on professional review on the organization of the professional and technical personnel to discuss, analyze and check between the professional drawings, check each other there is no contradiction, leakage; B. A method is proposed for the treatment, solution or advice; C. Problems and recommendations will be respectively documented, the internal supervision and the Contractor shall triage before by supervisor shall be timely submitted to the design contractor, in order to design the contrac

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档