土方回填方案样本(Earthwork backfill sample)

土方回填方案样本(Earthwork backfill sample) A project overview This works for the city of Shenyang second middle school north campus student apartment project, construction area of 27558.27m2, the six layer frame structure, the total height is 24.75m, the whole building is W. The foundation grouting pile foundation drilling, soil layer from top to bottom: the miscellaneous fill soil thickness of 0.5 to 0.8m; the silty clay layer with a thickness of 0 to 1.0m; the fine sand layer thickness of 0 to 1.0m. Two, technical requirements Because this project site is extremely smooth and natural, high elevation, so dig deep, according to the design and survey report, in the field, the soil layer is miscellaneous soil and silty clay, the rainy season, the rain continued, field soil water has reached saturation, so we must take effective measures in order to ensure that the earthwork project smoothly, otherwise, will directly affect the construction schedule of the project. 1, surface water efflux In order to ensure the surface soil less soaked by rain and infiltration, should be based on the terrain field soil, the presence of the region to set up a temporary set of wells, wells set by wall reinforcement cage fabrication, diameter 500mm, depth 700mm, reinforcing cage main reinforcement is phi 16@ 150, [email= 8@200] Phi Phi 8@ stirrups as 200[/email] outsourcing two layers of dense mesh, the bottom 200 thick gravel fill. Set well spacing for the specific location of 20000, see figure. Before the heavy rain, should set up specialized personnel will pump installed, rainfall, surface water should be discharged and the floor water. 2, a temporary road construction area Because the field soil of this project will be excavated are miscellaneous and silty clay, no bearing capacity after soaking rain, so it must be present in the construction of temporary road. The epidermis of 500 ~ 600mm thick silt is dug out with a backhoe excavator, and then fill in the hillside soil, mountain soil thick

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档