土方系数计算(Earthwork coefficient calculation).doc

土方系数计算(Earthwork coefficient calculation).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方系数计算(Earthwork coefficient calculation)

土方系数计算(Earthwork coefficient calculation) Earth conversion (2008-01-10 20:23:47) reprint labels: Gossip Summed up the general excavation is natural; compacting, embankment compaction, borrowers are generally ordinary soil, natural dense square. If the loan words should be multiplied by the coefficient of soil 0.87. to take the 0.80 to 0.92 by the hard soil. For example: One of the distinctive features of the new quota is in the subgrade soil rock engineering, considering the conversion coefficient between the natural and the compaction density, due to the use of this factor, in the calculation and allocation of the number of subgrade soil, rock excavation, we should consider this factor, which should not be simply according to section volume allocation. For Subgrade Earthwork engineering, excavation by natural dense volume calculation, calculation, fill volume after pressing so as to fill and compaction volume for engineering quantity, using natural compacting party as the calculating unit, the quota should be multiplied by the provisions of the conversion coefficient. The chapter explains the fixed coefficient, which transport column in the quota specified in the chapter, suitable for artificial excavation of Zengyun quota and motor dump trucks, tractors, earthmoving truck transport earthwork transportation quota. This coefficient include increasing the wastage cost for earth rock engineering project quota quota level are compiled in the section of the embankment construction, the efficiency level is low concentration of soil soil field. To borrow, the quota items in the calculation of the digging and loading, can put the number of parts, including the loss of earthwork completed by the artificial mechanical consumption, but for transportation, there is not much difference between the two situations, the same considerations on loss, increase the cost of manual and machinery. The quota chapter shows the coefficient using the rules illustrated as follows: On a line (

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档