土木工程施工4(Civil engineering construction 4)
土木工程施工4(Civil engineering construction 4)
Job name: Civil Engineering Construction of 2012 autumn fourth sets of operations
The budget objective test score: 100 points
Note: the objective question refers to a single topic, multiple-choice, non title can automatically judge the problem!
Detailed information:
Item number: 1 questions: RadioButtonList (please choose one correct answer in the following options in the score: 4)
Content:
Unit project construction plan design basis (not included)
A, total building plan
B, the construction unit can provide conditions
C, construction scheme
D, pipeline construction
Students answer: D
Right: right
Item number: 2 questions: RadioButtonList (please choose one correct answer in the following options in the score: 4)
Content:
Which of the following is not the evaluation unit construction schedule quality index ()
The degree of A, the main construction machinery
B, labor productivity
The balance of C, resource consumption
D, time
Students answer: B
Right: right
Item number: 3 questions: RadioButtonList (please choose one correct answer in the following options in the score: 4)
Content:
Which of the following does not belong to a unit project construction organization design of the main content. ()
A, construction plan
B, construction schedule
C, resource demand plan
D, construction scheme
Students answer: C
Right: right
Item number: 4 questions: RadioButtonList (please choose one correct answer in the following options in the score: 4)
Content:
Determine the construction flow, in addition to meet the needs of users and adapt to the construction organization of the partition segment, but also adapt to ()
A, a reasonable process plan
B, a reasonable division of the construction process
Reasonable construction sequence, leading engineering C
The principle of D, the leading engineering organization
Students answer: C
Right: right
Item number: 5 questions: RadioButtonList (please choose one correct answer in the following options in th
您可能关注的文档
最近下载
- 合理使用手机主题班会省公开课一等奖全国示范课微课金奖PPT课件.pptx
- 试卷3试卷答案4《运营管理(新形态版) 》_刘蕾曹俊玲.docx VIP
- 数学新课标2022版学习重要知识点考点总结 数学新课标最新版重点知识复习总结.docx
- 2023年中考语文二轮复习:文言文阅读 司马迁《史记》专项练习题汇编(Word版,含答案).docx
- 2024年中级银行从业资格考试《银行管理》真题汇编试卷(文末含答案解精品.pdf VIP
- 乡镇宣传工作总结PPT.pptx VIP
- 2024年疾控大学习突发公共卫生事件监测答案.docx VIP
- 车间冬季安全培训.pdf VIP
- 长阳路排水管道修复监理细则.pdf
- 你是这样的人降B正谱子五线谱乐谱曲谱歌谱高清.pdf
文档评论(0)