土方量的计算(Calculation of earthwork).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方量的计算(Calculation of earthwork)

土方量的计算(Calculation of earthwork) Earthwork calculation 8.2.1 DTM method of earthwork calculation By the DTM model to calculate the earthwork volume is measured according to the coordinates of ground points (X, Y, Z) and the design elevation, by generating triangulation to calculate the amount of earthwork every three pyramid, finally accumulated earthwork specified within the scope of cut and fill, and draw the demarcation line of earthwork. Three methods DTM method is a kind of earthwork calculation, is calculated by the coordinate data file, one is calculated in accordance with the elevation point on the map, the third is calculated in accordance with the triangulation on the map. The process of re establishing the triangulation algorithm contains two, third methods of directly using the existing map triangle, triangle mesh reconstruction no longer. The operation process of the following three methods: 1. according to the coordinate calculation L draw the line to calculate earthwork composite area must be closed, but dont try to fit. Because the line iterative fitting curve in earthwork calculation, influence the accuracy of calculation result. L with a click of the mouse from engineering application of \DTM method in earthwork calculation according to the coordinate file \. L tip: choose a click of the mouse from the painting line closed line figure 8-3 pop-up composite Earthwork Calculation Parameters dialog box. Figure 8-3 earthwork calculation parameters Area: the value of composite wire enclosed polygon level projection area. Flat field elevation: refers to the target to achieve the design elevation. Boundary sampling interval: boundary interpolation interval set, the default value is 20 meters. The slope slope treatment setting: select check box, then set the slope function is optional, selected slope way (up or down: a flat field elevation relative to the actual ground elevation height, flat field elevation above the ground elevation is downward sloping). T

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档