- 1、本文档共61页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
船舶维修清单(英文)
GENERAL SERVICE
1 G-001 Vessel docking/undocking time(s)
2 G-002 Charge for the first two days in dry-dock,
G-003 Charge for the rest days in dry-dock,
G-004 Surcharge for docking/undocking
- outside normal working hours,
- weekend and/or
- public holidays, days,
G-005 Surcharge for docking vessel in a partly loaded condition
- carrying ton(s) of cargo,
- fitting/removal of additional piece(s) of side blocks,
- fitting/removal of additional piece(s) of keel blocks,
G-006 Towage (dock yard moves)
Provide for vessel arrival and sailing,
Required tugs ,
G-007 Pilotage
Provide for vessel arrival and sailing
G-008 Riggers
Provide to handle mooring lines and gangway on arrival, shifting
and sailing.
G-009 Wharfage
G-010 Shifting
Vessel to be shifted from dry-dock to repair quay without “Engine”
with assistance of tugs, pilots and line handlers.
G-011 Electric shore power supply, 440V, 60Hz,
Temporary connection/disconnection,
G-012 Electric shore power supply, 440V, 60Hz, during repair period,
G-013 Fresh water from shore, temporary connection/disconnection
G-014 Fresh water supply from shore,
G-015 Seawater (ballast) from shore, temporary connection/disconnection,
G-016 Seawater ballast supply from shore,
G-017 Cooling-water (seawa
您可能关注的文档
最近下载
- 内蒙古乌尼特矿业有限责任公司乌尼特煤矿接续生产环境影响报告书.doc
- 特种设备-维护保养记录(叉车-电动托盘堆垛车).docx
- 《多边形的内角和》 示范教学PPT课件【初中数学人教版八年级上册】.pptx
- 紧密型县域医疗卫生共同体消毒供应中心运营指南(2020年版 医联体建设).docx
- 泵站运行考试(高级)习题库(第1部分).pdf
- 挡土墙计算理正岩土(“挡土墙”文档)共21张.pptx
- XXXX生态风景区智慧景区项目施工组织方案及对策.pdf
- 陈培勋平湖秋月五线谱钢琴谱.pdf
- 可爱的中国教案第10课可爱的中国第十课同心共筑中国梦.docx
- 2024《S市乡镇幼儿教师职业幸福感问卷调研分析报告》9700字.docx VIP
文档评论(0)