精益生产-拉动式系统-推荐.pptVIP

  • 9
  • 0
  • 约2.67万字
  • 约 77页
  • 2017-08-27 发布于河北
  • 举报
精益生产-拉动式系统-推荐

State: This slide demonstrates how to set-up the changeover priority wheel and how it operates. The changeover priority wheel is shown on the left, while a customized visual control board is on the right. The cards shown in the center provide a legend. Click the mouse and say: This shows a board currently loaded supporting production. This is what you would see if you walked out onto the production floor. Part number 1 is ready to run indicated by the red card. The numbers above the cards signify one half of the production pull loop. The top half of the board displays what number of pu

文档评论(0)

1亿VIP精品文档

相关文档