- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高考历史二轮复习精讲精练古代史专题社会主义从理论到实践教师版
2013年高考历史二轮复习 精讲精练古代史 专题05 社会主义从理论到实践(教师版)
【知识结构】
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways; Detailed technical courses see below. Figure 1.7-2 General technology route figure 2nd chapter City status and development planning 2.1 city basic profile 2.1.1
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model
您可能关注的文档
最近下载
- 《语文(基础模块)下册》(中职)教案 第24课 跨媒介阅读与交流(二).pdf VIP
- 《磨床安全操作规程》.docx VIP
- 青2013G02图集-标准图集.docx VIP
- 第36届全国中学生物理竞赛决赛理论考试试题与解答.pdf VIP
- DB45_T1900-2018_芒果成龄果树管理技术规程_广西壮族自治区 conv.docx VIP
- 软件测试-全套PPT课件.pptx
- 类风湿关节炎情景模拟教学案例范文.docx VIP
- 2025广西公需科目培训考试答案(90分)——“一区两地一园一通道”建设;人工智能时代的机遇与挑战(1).pdf VIP
- 化学核心素养引领单元主题学习之初探.docx VIP
- 钻床安全操作规程[共1页].doc VIP
文档评论(0)