大工13秋《建设工程法规》在线测试1(Big work 13 autumn construction engineering regulations online test 1).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工13秋《建设工程法规》在线测试1(Big work 13 autumn construction engineering regulations online test 1)
大工13秋《建设工程法规》在线测试1(Big work 13 autumn construction engineering regulations online test 1)
Big work 13 autumn construction engineering regulations online test 1
Multiple-choice questions, multiple-choice questions, multiple topics
First, radio questions (15 questions, 45 points)
1. before the start of construction projects, () should be at or above the county level peoples government administrative departments in charge of construction for a construction permit to work in accordance with relevant state regulations.
A. construction unit
B. construction unit
C. supervision unit
D. design unit
Developing options: B
2. the construction unit shall start construction within 3 months from the date of obtaining the construction permit. If it fails to start the project on time, it shall apply for an extension to the issuing authority. ().
A. the extension is limited to 1 times, not more than 3 months
B. the extension is limited to 1 times, not more than 6 months
C. the extension is limited to 2 times, each time not exceeding 1 months
D. the extension is limited to 2 times, each time not exceeding 3 months
Developing options: D
3. in accordance with the requirements of the construction permit system, the construction project is suspended for some reason, and shall be reported to the issuing authority within 1 months from the date of suspension of the construction.
A. project department
B. construction enterprises
C. supervision unit
D. construction unit
Developing options: D
4., the Bidding Law stipulates that bidders shall not bid below the cost of bidding. The cost here is (...).
A. average cost of bidders
B. estimated cost in the base bid
C. individual enterprise costs
D. offers lowest bidder costs
Developing options: C
5. construction units to apply for construction permits, construction funds should be implemented. In accordance with the regulations, the construction period is less than one year, the funds in place, in principle, not less than the cost of the project cont
您可能关注的文档
- 办公常用快捷键(Office shortcuts).doc
- 办公应用试题(Office application test questions).doc
- 办公常用软件(Office software).doc
- 办公室软件使用(Office software usage).doc
- 办公建筑安全疏散设计(Safety evacuation design of office building).doc
- 办公托管(Office hosting).doc
- 办公楼照明设计应用(Office building, lighting design, application).doc
- 办公用品分类(Office supplies category).doc
- 办公用品管理规定(Provisions on the administration of office supplies).doc
- 办公用品营销之大客户管理(Key customer management of office equipment marketing).doc
原创力文档


文档评论(0)